Supply of electrical energy to the University of Cologne
The UoC currently operates 24 delivery points with Registering Power Measurement (RLM) and 131 Delivery Points with Standard Load Profile (SLP). The projected total electricity demand for the tendered supply years amounts to approx. 45.5 GWh per year. Detailed information on the individual delivery points as well as the load profiles of the performance-measured delivery points can be found in the attached appendices.