- work to build foundations for poles and catenary poles;
- work to install poles, poles, consoles, sleepers, guy wires, metal equipment, engineering equipment, etc.;
- work to unroll the new catenaries on main tracks A and B of line 96 between Mons and Jurbise
- work to transfer ground cables and overhead fibre optic cables;
- transfer work, ripages, re-moulding with resumption of mechanical tensions, and adaptations of existing contact lines (including shut-offs) and earth cable;
- work to create new sectionings;
- work to transform existing sectionings;
- work on the assembly and connection of switches for bridging sections or 3 kV power supply;
- work to install gutters, remote control cables and 3 kV cables necessary to connect the new switches;
- work to remove catenaries, poles, consoles, sleepers, anchors, switches, metal equipment or not... existing ones that have become useless;
- asbestos removal work on the surfaces of the dice of the old catenary support structures prior to their demolition;
- various works such as the realization of the dice, ...;
- all studies necessary for the work listed above;
- the supply of metal equipment, concrete and other materials necessary for the work.
- work to build foundations for poles and catenary poles;
- work to install poles, poles, consoles, sleepers, guy wires, metal equipment, engineering equipment, etc.;
- work to unroll the new catenaries on main tracks A and B of line 96 between Mons and Jurbise
- work to transfer ground cables and overhead fibre optic cables;
- transfer work, ripages, re-moulding with resumption of mechanical tensions, and adaptations of existing contact lines (including shut-offs) and earth cable;
- work to create new sectionings;
- work to transform existing sectionings;
- work on the assembly and connection of switches for bridging sections or 3 kV power supply;
- work to install gutters, remote control cables and 3 kV cables necessary to connect the new switches;
- work to remove catenaries, poles, consoles, sleepers, anchors, switches, metal equipment or not... existing ones that have become useless;
- asbestos removal work on the surfaces of the dice of the old catenary support structures prior to their demolition;
- various works such as the realization of the dice, ...;
- all studies necessary for the work listed above;
- the supply of metal equipment, concrete and other materials necessary for the work.