The technical building equipment is designed for energy efficiency and ease of use.
The heat supply is planned analogous to the existing building with a district heating transfer station 100 KW (district heating connection) to cover the heat load. The dissipation of the required cooling load, especially the assembly hall / break hall and meeting rooms 22 kW, is achieved through the use of a 23 kW air conditioning split system based on the refrigerant R410A in conjunction with a ventilation unit assembly hall / use with an air volume of 9,300 m
To bring in the heat loads, "classic" plan radiators and convector radiators with a capacity of up to 2 kW, which are supplied with water at 70/30 degrees, are used.
To prevent unnecessary hot water storage, flow water heaters in accordance with DVGW W551 up to 10 kW intended. Approx. 1,500 m of foundation earth electrodes and 350 ring earth electrodes are provided for the lightning protection system. Passenger elevator AZ1
Execution as a rope elevator according to DIN EN 81-20 / 50
Nominal load 800 kg or 10 people, nominal speed 1 m / s, delivery height: 3.75 m
Lift shaft made of: concrete, shaft width: 2.00 m, shaft depth: 1.80 m, shaft head height: 3.20 m, shaft pit depth: 1.40 m.
As before.