The existing building is being completely renovated. The new community hall is arranged on the upper floor over two floors.
The library will be installed on the ground floor and basement. The outer walls of the building on the eaves and gables side are removed up to the ceiling on the 1st floor.
The best. The roof truss and the wooden beam ceilings on the 2nd floor, 1st floor and ground floor are completely removed.
A new reinforced concrete ceiling is being installed above the basement, ground floor and upper floor. The outer walls are reinforced by reinforced concrete columns from the ground floor to the roof.
A new building is being built in the basement. Rooms for music associations are created on the east side. Toilet facilities and shooting ranges with adjoining rooms are located in the north.
All ventilation and heating technology is installed in the west.
Ground floor: In the north-west, rooms are planned for the adult education center. Access is via the south side with an information entrance hall.
An information hall is planned in the south-east. Upper floor: Side rooms, changing rooms and cloakrooms are planned for the hall on the north side.
Core quantities:
Werkplanung total 1 psch
Programming total 1 psch
Display 1 piece
Signage player 1 pcs
Built-in speakers 14 pcs
Bluetooth connection panel, 2 pcs
Audio amplifiers 2 pcs
19-inch cabinet 3 pcs
Mounted speakers 2 pcs
Digital receiver 6 pcs
Controller 1 piece
Projector+lens 1 pc
canvas 1 pc
KNX gateway 1 pc
Transmitter 3 pcs
Wireless presentation 1 pc
Touch panel 2 pcs
Cell loudspeaker 4 pcs
Subwoofers 2 pcs
Delay speakers 2 pcs
Wireless microphone 22 pcs
Multi-control sound 1 pc
crossbeam 37 m
RGB spotlights 4 pcs
Theatre spotlights 10 pcs
Multi-control light 1 pc