Building automation.
“The building will be equipped with seven ISPs (2 units each on the ground floor and 1st floor and 3 units on the 2nd floor) for controlling, optimizing, controlling and monitoring the HLSE systems. A total of approx. 1,050 data points are required. In addition, around 11,000 m of electrical cable, Lan CAT 7 cables, installation cables, etc. are laid. Since building management technology was built by DEOS AG in the 1st BA and 2nd BA, the new system must be connected to the existing automation and building management system and integrated/coupled into school-wide fault message management. ”