Stadtwerke Rheine intend to build a new indoor pool at the existing outdoor pool on Kopernikusstrasse.
- Basement: approx. 2,060 m
- Ground floor: approx. 3 350 m
- Upper floor: approx. 895 m
- Total: approx. 6,305 m
Lime cement plaster approx. 5 200 m