The track system will be renewed as a ballast track. The renewal will be carried out in an optimized old
Layer. Approx. 505 m of track with Vignole rails 49 E1 will be renewed. At the beginning of construction and on
The end of construction will be connected to the existing track.
- 505m Vignole rails 49 E1, straight, arch R > 300m and clothoids with end arch R > 300m
- 783 prestressed concrete sleepers for rails 49 E1