A free-standing operating theatre building with basement (ground floor) + ground floor will be added to the existing clinic in Bad Windsheim as a new construction measure
in reinforced concrete construction, connected by means of two transition bridges in the ground floor.
Dimensions approx. 30m x 32m x h= 9.20m.
This new building + the two bridge structures including the existing connection will be wallpapered and painted, floors in the
Technikräumen ölfest gespachtelt.
Painting work for the main building, 2 transition walkways and adaptation of the existing building, interim rooms
-1 piece Preparation of summary documentation of all services rendered, 2 times in writing, 1 in pdf
-1 piece scaffolding for staircase up to 7.80m
-400m² sturdy film as protection of components, dustproof and waterproof
-1700m² masking of door frames, windows and window frames, skirting boards
-1600m² painter's fleece as temporary flooring protection
-2600m² wallpapering of glass fibre fleece, walls, gypsum plaster, Q3, up to h = 3.38m
-2900m² painting, wall surfaces, latex paints, 1K, NA1
-900m² painting, ceilings, dispersion with primer, 1K, NA2, white, GK smooth and perforated
-280m² painting work, ceilings dispersion with primer, 1K, NA2, white, reinforced concrete ceilings #
-420m² cleaning exposed concrete with hexafluoroosilicic acid base
-420m² thin-layer paint, glazing, on walls in exposed concrete
-1800m permanently elastic grouting, acrylic, 10-20mm
-300m² cement-based levelling filler up to 5mm
-300m² oil-resistant paint as floor coating, polyvinyl acetate, water-dilutable