Allocation of general planning services for the "Triphönix" project. The Zweckverband Müllverwertung Schwandorf (ZMS) has been operating a waste power plant in Schwandorf with a total of 4 waste boiler lines and a total capacity of around 450,000 Mg / a (IBN 1982) on a combustion output of 18.7 mg / h each with a design calorific value of 7 900 kJ / kg or approx. 12 mg / h with a current calorific value of around 11 000 kJ / kg , as well as the changed waste composition since the boiler design, the DMF now intends to completely replace the above furnace lines 1 to 3 with new systems.
For the complete replacement of furnace lines 1-3, general planning services are now required for the project already described in the service profiles of engineering structures, technical equipment and structural planning, as well as project control services. Holistic processing includes all the services mentioned in the service description, as well as the organizational coordination of the processing as well as the exchange of information and communication with the project participants mentioned in the service description. The services are to be awarded in the tiered contract in accordance with the assignment levels in the tender documents. In addition to the basic services, special services are also awarded, which are shown in the service description. Preliminary schedule: Start of services, planned services: 1.12.2020 Approval procedure and 1st construction phase (RGR4) Basic Engineering (LPH 2): January 2021 to March 2021 Creation and submission of the approval application: April 2021 to September 2021 Approval procedure, approval: October 2021 to March 2022 Planning, preparation of LV (demolition and process engineering RGR4): April 2021 to September 2021 Tender, request for quotation: October 2021 to March 2022 Production, delivery: April 2022 to March 2023 Disassembly, assembly, trial operation, acceptance: January 2023 to December 2023 approval process, as well as the 2nd and 3rd construction phases (furnace lines 1 and 2 new) Basic Engineering (LPH2): January 2021 to March 2021 Creation and submission of the approval application: April 2021 to December 2021 Approval procedure, granting the approval: January 2022 to December 2022 Planning, creation LV (demolition and dismantling, process engineering): April 2021 to May 2022 tender, solicitation of offer (Fig ruch and dismantling, process engineering): June 2022 to December 2022 planning, creating LV (construction technology): January 2023 to December 2023 tender, solicitation of offer: January 2024 to June 2024 assembly construction technology (1. Section for OL 1n): July 2024 to September 2025 production, delivery of process technology 2nd construction phase: January 2023 to December 2023 disassembly, assembly, trial operation, acceptance of 2nd construction phase: October 2023 to September 2025 production, delivery of process technology 3rd construction phase: April 2025 until March 2026 assembly of building technology (2nd section for OL 2n): January 2027 to March 2028 dismantling, assembly, trial operation, acceptance: April 2026 to March 2028 It is pointed out that there is very limited space and the project is carried out while the power plant is in operation got to.