Extended structural work
The new building includes an extension for the Bertha-von-Suttner secondary school.
The areas are spread over 4 storeys plus a ground-floor connecting building
The following services, excerpts, will be advertised.
Excavation of different soil classes (up to Bdkl. 6-7): approx. 7,000 cbm.
Shoring girder pile wall approx. 390 sqm.
Floor slabs WU approx. 1,550 cbm.
Stb. ceilings approx. 5,900sqm.
Stb. Exterior walls SB2 partly. WU approx. 440 cbm.
Stb. interior walls SB2 approx. 530 cbm..
Stabstahl ca. 540 to.
Mattenstahl ca. 110 to.
Facing work NF approx. 520 sqm.
Facing work Kammstein NF approx. 1,550 sqm.