The contract includes optional installments defined in the specifications.
Implementation of a temporary boiler room: removal of the two HS boilers, installation of a temporary boiler with power 900 kw.
TF: heating — removal of HS boilers, installation of a temporary boiler with power 900 kw, installation of a heat exchanger including connection to the existing one, and reinstatement of gas installation standards.
The contract includes optional installments defined in the specifications.
Implementation of a temporary boiler room: removal of the two HS boilers, installation of a temporary boiler with power 900 kw.
TF: heating — removal of HS boilers, installation of a temporary boiler with power 900 kw, installation of a heat exchanger including connection to the existing one, and reinstatement of gas installation standards.