A turbine and generator revision is to be carried out in September 2020 on a turboset consisting of an AEG extraction, condensation steam turbine and an air-cooled generator
Scope:
- vibration analysis before switching off the turbo set,
- Check on the steam turbine before dismantling the steam section,
- Checks on the steam turbine after disassembly or reassembly of the steam section,
- Valves disassembly and reassembly with inspection,
- checking rotor,
- inspection of guide vane carrier,
- Control / dismantling control and safety devices,
- Check the sealing steam regulators HD and ND,
- oil system control,
- Check removal - check valve,
- material testing,
- Check rotor turning device hyd,
- revision gear (spur gear),
- clutch revision,
- revision genera,
- revision generator,
- assessment,
- commissioning.
Major turbine and generator revision.