Painting work to be carried out as part of the project to build a new Integrated Centre for the Elderly in Eischen. The building has a total area of 5.945m2 and consists of two buildings connected by a connection area of 75 m²: Main building: 3.890 m²; Residence 2.000 m² It is planned to carry out the following works: Wallpaper work: 12.300 m² "Vintage" wallpaper work: 4500 m² Painting work on walls (cement and plaster plaster): 11.780 m² Painting work on cement walls: 600 m² Painting work on ceilings (plaster) : 8650 m²
Painting work to be carried out as part of the project to build a new Integrated Centre for the Elderly in Eischen. The building has a total area of 5.945m2 and consists of two buildings connected by a connection area of 75 m²: Main building: 3.890 m²; Residence 2.000 m² It is planned to carry out the following works: Wallpaper work: 12.300 m² "Vintage" wallpaper work: 4500 m² Painting work on walls (cement and plaster plaster): 11.780 m² Painting work on cement walls: 600 m² Painting work on ceilings (plaster) : 8650 m²