Planning services:
- reactivation plans for local public transport on a 14.4 km single-track line,
- 6 stops,
- construction costs: approx. EUR 12.860 million,
- 41 level crossings.
- Planning traffic systems § 45 HOAI, KG 371 road traffic systems, KG 372 rail traffic systems (+ BÜSTRA systems), KG 537 track systems - cost groups according to DIN 276 / 2018-12, LP 1 to 4,
- Planning of control and safety technology § 55 HOAI, LP 1 to 4.
Gradual commissioning is planned:
Level 1: LP 1 to 2; Level 2: LP 3 to 4.