The subject of the contract is the implementation of the task entitled Reconstruction of heat networks in the area of Głowackiego Street, from point PW1 to point PW2, i.e. execution of construction works consisting in the replacement of existing heat networks made in the traditional system with a heat network in the technology of pre-insulated pipes in Olsztyn, from the Contractor's materials as part of the project entitled "Reducing the emission of the economy by improving the efficiency of heat distribution in Olsztyn as a result of the reconstruction of networks and nodes district heating – stage II".
A detailed description of the subject of the contract specifies:
Appendix No. 1 – Construction project of Głowackiego Street
Appendix No. 2 – Inventory of greenery on Głowackiego Street
Appendix No. 3 – Bulwark of Głowackiego Street, from point PW1 to point PW2.
Annex No 4 — Technical Specification for the Performance and Reception of Works.
The scope of the order:
a) Construction and assembly works:
• dismantling and demolition work,
• earthworks,
• purchase, delivery and installation of fittings, pipelines,
• landscaping and ordering of the land,
• construction of thermal networks,
• Reception required.
b) Execution of surveying inventory and as-built documentation.
In addition, the Contractor is obliged on its own and at its own expense
in particular, to:
• felling of trees and shrubs,
• implementation of the BIOZ plan,
• site occupation, including road lanes and payment of related charges,
• notification of property managers of the planned time limit for carrying out the work,
• preparation of the site for construction with its signage,
• development of a road traffic organization project,
• safeguarding the construction site against third party access,
• ensuring the operation of surveying investments,
• solving the question of water and electricity consumption,
• assembly of network by-streaks provided for in the design documentation,
• restoration of the site and pavement to the previous condition, confirmed by the protocol signed by the site manager or owner,
• liability insurance to the extent specified in the draft contract (which is Annex 5 to the SWZ),
• construction insurance against damage likely to occur and from sudden, random events and civil liability works, equipment and construction equipment,
• exportation of debris and other demolition materials, together with waste disposal.
The subject of the contract is the implementation of the task entitled Reconstruction of heat networks in the area of Głowackiego Street, from point PW1 to point PW2, i.e. execution of construction works consisting in the replacement of existing heat networks made in the traditional system with a heat network in the technology of pre-insulated pipes in Olsztyn, from the Contractor's materials as part of the project entitled "Reducing the emission of the economy by improving the efficiency of heat distribution in Olsztyn as a result of the reconstruction of networks and nodes district heating – stage II".
A detailed description of the subject of the contract specifies:
Appendix No. 1 – Construction project of Głowackiego Street
Appendix No. 2 – Inventory of greenery on Głowackiego Street
Appendix No. 3 – Bulwark of Głowackiego Street, from point PW1 to point PW2.
Annex No 4 — Technical Specification for the Performance and Reception of Works.
The scope of the order:
a) Construction and assembly works:
• dismantling and demolition work,
• earthworks,
• purchase, delivery and installation of fittings, pipelines,
• landscaping and ordering of the land,
• construction of thermal networks,
• Reception required.
b) Execution of surveying inventory and as-built documentation.
In addition, the Contractor is obliged on its own and at its own expense
in particular, to:
• felling of trees and shrubs,
• implementation of the BIOZ plan,
• site occupation, including road lanes and payment of related charges,
• notification of property managers of the planned time limit for carrying out the work,
• preparation of the site for construction with its signage,
• development of a road traffic organization project,
• safeguarding the construction site against third party access,
• ensuring the operation of surveying investments,
• solving the question of water and electricity consumption,
• assembly of network by-streaks provided for in the design documentation,
• restoration of the site and pavement to the previous condition, confirmed by the protocol signed by the site manager or owner,
• liability insurance to the extent specified in the draft contract (which is Annex 5 to the SWZ),
• construction insurance against damage likely to occur and from sudden, random events and civil liability works, equipment and construction equipment,
• exportation of debris and other demolition materials, together with waste disposal.