The maintenance section of the N12, which is the subject of this project, is located between the La Veyre branch and the Fégire veveyse bridge, near the Châtel-St-Denis junction. It is 6.1 km long (in both directions), from PR 0+355 to PR 60+480.
The project aims to replace the top layer and binder layer on this section including the breakdown strip. The surface layers of the bridges of Cucloz, Denève and Saumont are also part of the project.
The engineering services as project author (PV) and certain services as client support (BHU) for all project phases from the action project (MP) to commissioning (phase 53) are the subject of the mandate advertised.
The maintenance section of the N12, which is the subject of this project, is located between the La Veyre branch and the Fégire veveyse bridge, near the Châtel-St-Denis junction. It is 6.1 km long (in both directions), from PR 0+355 to PR 60+480.
The project aims to replace the top layer and binder layer on this section including the breakdown strip. The surface layers of the bridges of Cucloz, Denève and Saumont are also part of the project.
The engineering services as project author (PV) and certain services as client support (BHU) for all project phases from the action project (MP) to commissioning (phase 53) are the subject of the mandate advertised.