Waste disposal site construction work | Tenderlake

Waste disposal site construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
02 December 2019
Closing Date:
30 December 2019
Location(s):
LU LUXEMBOURG
Description:
Tenderer selection in the context of a restricted invitation to tender for the production of a base waterproofing at the landfill Muertendall in Luxembourg

Production of a base waterproofing in the 4th stage on flat inclined floor surfaces and 1: 3 inclined slopes with the following structure:

- earthworks for the formation of the geological barrier,

- mineral seal, d = 0.75 m, 3-ply,

- PEHD plastic waterproofing membranes, d = 2.50 mm,

- Geotextile, 1 200 g / m 2 .

- sand protection layer, d = 0.20 m,

- drainage layer of gravel, d = 0,30 / 0,50 m,

- Drainage pipes made of PEHD, DN 160 to 400,

- applying rubble waste,

- garbage transfer.

The sealing area is approx. 18,000 m 2 Furthermore, expand:

- degassing pipes,

- gas well,

- intermediate covers,

- access roads to the garbage installation sites,

- Rehabilitation of a leachate tank 140 m 3 .

- renovation of a washing area,

- Renovation and renewal of the landfill road (asphalt) Corresponding self-monitoring and work and safety precautions must be taken into account and carried out by the construction company. All construction measures are according to a quality assurance plan au.

Production of a base waterproofing in the 4th stage on flat inclined floor surfaces and 1: 3 inclined slopes with the following structure:

- earthworks for the formation of the geological barrier,

- mineral seal, d = 0.75 m, 3-ply,

- PEHD plastic waterproofing membranes, d = 2.50 mm,

- Geotextile, 1 200 g / m 2 .

- sand protection layer, d = 0.20 m,

- drainage layer of gravel, d = 0,30 / 0,50 m,

- Drainage pipes made of PEHD, DN 160 to 400,

- applying rubble waste,

- garbage transfer.

The sealing area is approx. 18,000 m 2 Furthermore, expand:

- degassing pipes,

- gas well,

- intermediate covers,

- access roads to the garbage installation sites,

- Rehabilitation of a leachate tank 140 m 3 .

- renovation of a washing area,

- Renovation and renewal of the landfill road (asphalt) Corresponding self-monitoring and work and safety precautions must be taken into account and carried out by the construction company. All construction work must be carried out according to a quality assurance plan.

All work is checked by an external external monitoring. Duration in days (counting from the date of contract award): 700.