New construction of the Koppelesbach daycare centre - tiling work
New construction of the Koppelesbach daycare center, here tile work.
The performance includes the following dimensions:
54m² substrate cleaning screed
54 m² pre-coat synthetic resin dispersion
54 m² waterproofing floor area W2-I mineral sealing slurries
80 m connection of rising components AIV-F inner wall inside sealing tape
54 m² tiles Flooring mosaic 10/10cm R10
20 m tile base H:10cm
87 m edge joint floor fill elastic joint sealant
23 m² Tiles Flooring Kitchen 20/20cm R10
24 m² Tiles Flooring Kitchen 20/20cm R11
46 m tile throat base 10/20cm
151 m² Wall tiles mosaic 10/10cm
67 m² Wandlfiesen Küche 20/20cm
10 St Fliesenrahmen Stahl niro
20 St Feuchtigkeitsmessung