New construction of the Vitelliusbad Wittlich
here: Building management systems, I&C systems
Coarse mass:
- 2 pcs ISP consisting of 10 control cabinets in total
- 47 St Regelventile (Dreiwegeventil, Durchgangsventil) / Klappenantriebe
- 128 pcs other field devices
Part of the tender is the control system for the new construction of an indoor pool and the associated outdoor pool building.
A building management system (BMS) is planned to ensure safe and energy-optimized operation.
ISP = Informationsschwerpunkte sind:
Electric
heater
Sanitary
ventilation
Water treatment (not part of this tender)
A DDC regulation is provided for the electrical, heating and ventilation trades.
The automation stations of the respective systems are located in a control cabinet as a stand-alone cabinet at the information centres.
The control cabinets can be operated directly from the cabinet via touch panel and from the BMS via a PC workstation, faults are indicated in the BMS and on the cabinet itself.
A manual operating level enables the continued operation of all systems in the event of DDC failure.