The client has recently developed a verification calculation method for concrete tube bridges. Together with market parties, the client wants to optimize this methodology. This is achieved by having a number of tube bridges recalculated by 3 different market parties and evaluating their experiences with the methodology.
The complexes to be calculated now have been deliberately chosen. They are the oldest bridges within the RWS area and determining structural safety is necessary in the short term. The methodology will form the basis for recalculating the remaining approximately 100 tube bridges in the RWS area.