Extended structural work
- Construction site equipment, setting up meeting and toilet containers including drinking and dirty water pipes, setting up construction electricity and lighting for the entire construction period, making core holes;
- Floor works on a floor area of approx. 1,000 m
- Shoring works (girder screed wall "Berlin shoring, with anchoring");
- drainage works;
- Reinforced concrete work for the 3-storey building on a floor area of approx.24x24m including the manufacture of a basement as a white tub (WU construction) with a fresh concrete composite film (the building is partly in the floodplain of the line), system planning for WU construction, Installation parts, perimeter insulation, precast stairways;
- Masonry work (approx. 1,000 m
- facing masonry (approx. 1,000 m
Extended structural work
- Construction site equipment, setting up meeting and toilet containers including drinking and dirty water pipes, setting up construction electricity and lighting for the entire construction period, making core holes;
- Floor works on a floor area of approx. 1,000 m
- Shoring works (girder screed wall "Berlin shoring, with anchoring");
- drainage works;
- Reinforced concrete work for the 3-storey building on a floor area of approx. 24 x 24 m incl.production of a basement as a white tub (WU construction) with a fresh concrete composite film (the building is partly in the floodplain of the line), system planning for WU -Construction, built-in parts, perimeter insulation, precast stairways;
- Masonry work (approx. 1,000 m
- facing masonry (approx. 1,000 m