- Production of play areas with various Play equipment and fixtures
-manufacture of drainage devices and their connection
to the RW ground line
-Timber construction: production of wood paneling of the prefabricated garage and the new garbage box
-Metalwork: production and assembly of a garbage box
-Paving: Production of pavements and car parking spaces in concrete stone pavement, as well as asphalt work along the adjacent streets “Hauptstraße” and “Birkenweg”, including borders
-Production of enclosures: wooden fence and steel mesh fence including gate and door systems
-Production of power lines and foundations for bollard and mast luminaires
-Production of planting and lawn areas as well as planting trees, shrubs, perennials and hedges
-Laying cable protection pipe DN 75 approx. 330 m
- Double garage, 6.00 x 5.20 x 2.50 m1 pcs.
-Antifreeze gravel 0/56approx. 430 m3
-Gravel base layer 0/32approx. 150 m3
-Mount concrete lowboard, 10x25 cmapprox. 388 m
-Concrete high board, 12-15x30 cmapprox. 52 m
-V-channel made of granite large plasterca. 117 m
-Asphalt surface including asphalt base layerapprox. 190 m2
-concrete stone paving, shell limestone nuanced approx. 500 m2
-concrete stone paving with drainage joint, greyapprox. 235 m2
-Wire mesh fence, height 1.20 mca. 235 m
-Gate and door systems, bar steel mesh fence5 pcs.
-Wooden fence, height 90 cmapprox. 40 m
-door systems, wooden fence2 pcs.
-Gaming equipment10 pcs
-Planting areaca. 395 m2
-Lawn areaca. 800 m
Tree plants16 pcs.
planting single shrubs39 pcs.
- hedge plantingapprox. 168 m