TP1: Construction of the central heat supply of Körner barracks with the following essential components:
- heat is generated with a pellet and gas boiler and possibly a CHP,
- Heat supply network of the entire property is renewed,
- all buildings receive new heat-technical house stations.
TP2: The building automation of the Körern barracks has to be brought up to date with the current manual GA of the Bundeswehr. Essential components are:
- Laying fiber optic cables in an empty conduit network in the entire property,
- equipping all consumers with M-Bus meters,
- Connection of the control of ventilation and heating as well as fault and operating message on GA,
- Equipment of almost all buildings with a GA cabinet,
- Connection to island headquarters in the Lützow barracks.
Specialist planning Technical equipment for the II. 1.4. said construction measure
(TP1) New building ZVA incl. Heat supply network and heat-technical house stations: Plant groups 1, 2, 3, 4, 5, 8
(TP2) Renovation of building automation, system groups: 2, 3, 4, 5, 8
Commissioning is optional in stages.