The city of Rheda-Wiedenbrück is building a new town hall In this course, the exterior facilities of the Stadthalle, as well as a parking lot are manufactured southeast of the Stadthalle.
The city of Rheda-Wiedenbrück is building a new town hall in this course, the outdoor facilities of the Stadthalle, as well as a parking lot are manufactured southeast of the Stadthalle. The performance "outdoor facilities" includes the following, keyword-like masses:
- construction site equipment,
- Ground works for the production of the fortified areas and trenches about 4 200 m
- Base courses and antifreeze layers for paved areas produce approx. 9 600 m
- Concrete paving areas with borders produce approx. 4 750 m
- Sickerfugenpflaster with borders produce approx. 2 000 m
- Asphalt surfaces produce approx. 2 600 m
- precast concrete parts approx. 140 running meter,
- Noise barriers approx. 230 running meters,
- Drainage: Box and facade gutters approx. 200 m, road and yard drains approx. 15 h, infiltration troughs approx. 750 m
- Lighting: Mast lights Stele about 8 St., bollards about 4 St., spotlight about 12 St., Mastleuchten about 25 St.?
- Bicycle bar about 44 St.
- Topsoil works approx. 1 500 m
- Planting areas produce approx. 600 m
- trees and shrubs 63 h.,
- Lawns produce about 3 000 m