As part of the façade renovation of the six-storey administration building, 519 units of undivided 3-fold glazed aluminium tilt-and-turn windows, some of which are motor-controlled + window panels and aluminium external venetian blind systems are required.
- preparatory actions
- Dismantling of existing windows (wood, plastic)
- Filling/plastering work on window openings
- Installation of aluminium windows, 60% motor-controlled
- Installation of electr. Aluminum venetian blind systems
- Aluminum parapet cover sheets (185m), window reveal sheets, extruded window sills, exterior
- Documentation + maintenance work
Individual deadlines for execution:
Leistungsbeginn: 14.09.2023
Completion of workshop planning + static verifications:
24.11.2023
Delivery of sample profile with surface treatment and
Patterns of all other elements (external venetian blind slats,
Fenstergriffe, etc): 24.11.2023
Delivery sample window: 19.02.2024
Ausführungsbeginn (Fensterdemontage): 06.05.2024
Ausführungsbeginn (Fenstermontage): 20.05.2024
Completion (window installation): 09.08.2024
Completion (installation of external venetian blinds + sheet metal work): 20.09.2024
Standard lot