The subject of the tender is the supply of electrical energy (green electricity) for various consumption points of Lower Saxony municipalities, associations and municipal companies in the districts of Hanover, Lüneburg and Weser-Ems.
In the present tender procedure E/0166 (2) - E/0168 (2), the lots which could not be awarded in the previous tender procedures E/0166 District of Hanover, E/0167 District of Lüneburg and E/0168 District of Weser-Ems were grouped together.
The original lot designations have been retained for the present tender procedure E/0166 (2) - E/0168 (2).
Delivery period: 01.01.2024, 0.00 a.m. to 31.12.2024, 12.00 p.m. (1 year of delivery).
The acceptance points of the participants were divided into 4 regional and individual lots by the tendering body.
For further details, please refer to the service description.
"Hildesheim / Hannover"Green electricity for approx. 308 consumption points with an electricity consumption in the reference year of approx. 3,272,507 kWh/a.
It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.
Delivery period from 01.01.2024, 0.00 hrs to 31.12.2024, 24.00 hrs (1 delivery year).
Losteilnehmer:
241513 Fire Brigade Accident Insurance Fund of Lower Saxony
254002 City of Alfeld (Leine)
254014 city of Elze
254042 municipality of Freden (Leine)
254045 Municipality of Sibbesse
"Abwasserverband Alme-Riehe"Green electricity for a consumption point with an electricity consumption of approx. 692,637 kWh/a in the reference year.
It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.
Delivery period from 01.01.2024, 0.00 hrs to 31.12.2024, 24.00 hrs (1 delivery year).
Losteilnehmer:
254503 Wastewater Association Alme-Riehe
"Lüneburg / Uelzen"Green electricity for approx. 670 consumption points with an electricity consumption in the reference year of approx. 4,517,694 kWh/a.
It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.
Delivery period from 01.01.2024, 0.00 hrs to 31.12.2024, 24.00 hrs (1 delivery year).
Losteilnehmer:
355406 Samtgemeinde Ostheide
360002 City of Bad Bevensen
360004 municipality of Bienenbüttel
360005 Flecken Bad Bodenteich
360006 Monastery patches of Ebstorf
360007 municipality of Eimke
360009 Municipality of Gerdau
360013 municipality of Lüder
360020 Municipality of Soltendieck
360023 municipality of Suderburg
360026 Municipality of Weste
360029 municipality of Wriedel
360030 Gemeinde Wrestedt
360405 Samtgemeinde Suderburg
360407 Samtgemeinde Bevensen-Ebstorf
360408 Samtgemeinde Aue
"Oldenburg"Green electricity for approx. 218 consumption points with an electricity consumption of approx. 3,905,836 kWh/a in the reference year.
It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.
Delivery period from 01.01.2024, 0.00 hrs to 31.12.2024, 24.00 hrs (1 delivery year).
Losteilnehmer:
458005 municipality of Ganderkesee
458010 Municipality of Hude
458401 Samtgemeinde Harpstedt