The contract is part of the collaboration agreement signed on 25.4.2015 between CEA and the Soreq Nuclear Research Center in Tel Aviv (Israel) for the realization of the SARAF proton and deuteron accelerator project (Soreq applied research accelerator facility).
Under the terms of this agreement, the CEA is in charge of the design, construction and assembly until the systems are commissioned on site, for testing at its premises and then for transfer to Israel for assembly and testing. reception.
The services subject of this contract notice consist of the design and production of electronic systems for beam position monitors for the SARAF accelerator.
The services covered by this contract notice consist of the design and production of electronic systems for beam position monitors (BPM) for the SARAF accelerator.
The services subject of this contract notice include:
- the studies,
- the production of a pre-series of 4 electronic systems for BPM,
- the realization of a series of 20 electronic systems for BPM.
The market also has 2 options relating to:
- option 1: calibration of the global BPM system,
- option 2: supply of 2 analog outputs.