The present tender includes a complete main contract for the construction of 43 homes, divided into 10 low-density homes and 33 apartments spread over 2 apartment buildings.
The project is located at Torvegyden 3, 9520 Skørping.
The contract is put out to tender by restricted invitation to tender with the expectation of a negotiated procedure.
The present invitation to tender includes a complete main contract tender.
The project consists of new construction of 43 homes, 10 close-to-low housing and 33 apartments spread over 2 apartment buildings.
The plot is located on the outskirts of Skørping and is bounded to the east by Skørping Nykirke.
The project will be built as 3 groups of townhouses, all with the same type of accommodation of 105m² and 4 rooms.
The homes are carried out on one level with 3 rooms and large living room, as well as backyard with terrace and front garden with access to depot. In addition, 2 apartment buildings are being built with 33 apartments in total with apartment sizes ranging from 66m² to 106m². All apartments in the apartment buildings have their own balcony, facing west or south.
The building will be built in traditional and well-known materials, such as brick, wood, balconies with glass front and roofing felt.
The main contract assignment is further described in the tender documents.