The listed ward building "Haus Monika" at the site of the St. Hedwig Hospital in Berlin Mitte is being extensively rebuilt and renovated in several sections. The work will be carried out on all floors (basement to 4th floor) of the existing building on an area of 6,600 m² GFA.
The following services, among others, are part of the tender (excerpt from the course):
- Löschwasserleitung Stahl, AD 88,9 ca. 65m
- Löschwasserleitung Stahl, AD 60,3 ca. 15m
- Pipe clamps approx. 60 pieces
- Extinguishing water supply fitting, 2 pieces
- Dry connection extraction fitting 9 pieces, of which 4 as a built-in cabinet and 1 as a wall cabinet
- Fire protection clothing approx. 4 m incl. fittings
- Profile steel construction indoors approx. 50 kg
- Rolling scaffolding up to 5 m 1 piece