The new theatre hall with classrooms for the Waldorf School Munich Southwest (BA2b) is the last construction phase on the school campus. The new building is the second construction phase of the BA2a teaching building, which was completed in 2021, and both construction phases are separated by an existing fire wall. About a
2 / 5
On the 1st floor, a structural connection to the school's administration building (completion 2018) will be established.
The new building is three-storey, has no basement and includes a theatre hall with foyers and ancillary rooms, classrooms and an open ground-floor garage.
GFA(R) approx. 2,030 sqm, GFA(S) approx. 165 sqm
BRI(R) ca. 10.540 cbm, BRI(S) ca.970 cbm
New 3-storey building with reinforced concrete walls and ceilings, no basement, as an extension to an existing school building,
Passenger elevator
Head: 7.4 m
Stops 3 (ground floor / floor 1 / floor 2)
Entrances 3 pieces, on top of each other
Load capacity 1600 kg or 21 persons
Cabin, W/D/H 1400mm x 2400mm x 2200mm
Fastening system dowel mounting