The Lausitzbad Hoyerswerda was built in the 1990s as a family and leisure pool including an extensive sauna area. After 20 years of operation, the Lausitzbad Hoyerswerda is to be modernized and adapted to current user requirements and local needs. The realization takes place in a total of 6 construction phases.
• Lot-owned construction site equipment (including protective measures for finished services)
• Cleaning 1407 m² of substrate
• 137 m² wall plaster knock off small areas
• 645 m² Abklebearbeiten
• Inspect and prepare 1219 m² of substrate
• 512 m² to compensate for unevenness
• 10 m² adhesive filling on concrete
• 3,250 m² of primer plaster primer
• 2.550 m² Spritzbewurf
• 1.480 m² Ausleichsputz
• 3,170 m² of lime-cement plaster as a base plaster
• 490 m² felted finishing plaster, Q2
• 1,620 m² felted finishing plaster, Q3
• 2,160 m² plaster reinforcement interior walls
• Plaster 40 m of supports
• Plaster 445 m reveal
• 105 m plaster smooth coating in reveals
• 400 m Putzabschlussprofile, Aluminium
• 170 m plaster end profile, stainless steel
• 725 m PVC plaster finish profile with fabric strips
• 60 m edge formation with corner angle, stainless steel
• 112 m movement joint profile in wall surfaces, aluminium
• 10 m movement joint profile in wall surfaces, stainless steel
• 265 m movement joint profile at inner corners, aluminium
• 110 m movement joint profile at inner corners, stainless steel
• 1.160 m Schnellputzprofile, Aluminium
• 830 m quick cleaning profile, stainless steel
• Plaster 580 m of cable slots
• 824 m² full-surface fabric filler existing wall