Extension of the Bad Hersfeld district administration - painting work
painting work
- approx. 30 m 2 Coating of exposed concrete components in the outdoor area,
- approx. 200 m 2 Coating of reinforced concrete ceilings,
- approx. 2,000 m 2 Coating of plasterboard ceilings (partly as perforated plaster ceilings) or plasterboard friezes,
- approx. 800 m 2 Wall painting on reinforced concrete or plaster,
- approx. 800 m 2 Wall coating in stairwells,
- approx. 15,000 m 2 Wall coating made of glass fabric or painter's fleece with paint,
- approx. 300 m 2 Wall coating in wet rooms or toilets,
- approx. 150 m 2 Painting of steel railings in stairwells,
- approx. 280 m 2 Painting of sheet steel door elements including frames,
- approx. 380 m 2 Painting of steel frames of different sizes,
- approx. 500 m 2 Floor coating in technical or adjoining rooms,
Execution period: May to October 2021.
painting work
- approx. 30 m 2 Coating of exposed concrete components in the outdoor area,
- approx. 200 m 2 Coating of reinforced concrete ceilings,
- approx. 2,000 m 2 Coating of plasterboard ceilings (partly as perforated plaster ceilings) or plasterboard friezes,
- approx. 800 m 2 Wall painting on reinforced concrete or plaster,
- approx. 800 m 2 Wall coating in stairwells,
- approx. 15,000 m 2 Wall coating made of glass fabric or painter's fleece with paint,
- approx. 300 m 2 Wall coating in wet rooms or toilets,
- approx. 150 m 2 Painting of steel railings in stairwells,
- approx. 280 m 2 Painting of sheet steel door elements including frames,
- approx. 380 m 2 Painting of steel frames of different sizes,
- approx. 500 m 2 Floor coating in technical or adjoining rooms,
Execution period: May to October 2021.