Helsingør Kraftvarmeværk A/S is operating a gas-fired combined cycle plant at the site of Energivej 19 in
Helsingør. A decision has been made to renew the existing plant by establishing a biomass-fired boiler at the site.
The existing turbine condensers (district heating) to the existing steam turbine (combined cycle) will be utilised for the new steam turbine. Only 1 steam turbine will be in operation at a time. It will not be possible to run combined cycle plant and bio boiler plant in parallel. The combined cycle plant will mainly be used as a back-up.
The new biomass fired plant will consist of a boiler unit with flue gas cleaning and flue gas condensation. There will be a power output of 62 MW (steam flow 20,8 kg/s). Nominal design data will be 500
The scope of the inquiry will cover a steam turbine, generator and gearbox within the specified battery limits.
The procurement consists of a complete steam turbine with necessary auxiliary systems. The steam turbine will be located in a new building adjacent to the existing combined cycle building.
The scope includes design, engineering, manufacturing, delivery and erection of all equipment and systems as well as the commissioning and final testing of the steam turbine. The scope also includes training of the purchaser's staff as well as operation and maintenance instructions for the plant.