The city of Ratingen intends to expand the existing school complex with a new building for 12 classes, 2 music and ancillary rooms, renovation and renovation of the school's existing building as well as renovation measures in the neighboring building complex consisting of the theater and sports hall.
The service description includes all measures of interior plastering and the renewal of the vapor barrier on the windows/façade for the conversion of the school complex in 4 construction phases. In the Schule Bestung subproject, a comprehensive renovation with reconstruction measures takes place throughout the entire
Existing building. The school will be brought up to a sustainable standard in terms of room layout, room quality and technical expansion.
Waterproofing— Remove old sealing windows, including disposal
2.BA: 510 m; 3.BA: 510 m; 4.BA: 1 835 m; 5.BA: 1 835 m approx. 4 690 m
— Underground pretreatment and primer window connection
2.BA: 510 m; 3.BA: 510 m; 4.BA: 1 835 m; 5.BA: 1 835 m approx. 4 690 m
— application of airtight sealing film inside the window connection
2.BA: 510 m; 3.BA: 510 m; 4.BA: 1 835 m; 5.BA: 1 835 m approx. 4 690 m.
Innenputzarbeiten— Compensation cleaning d =10 mm, walls, columns, parapet
— 2.BA: 420 m
— compensating cleaning d = 40 mm,
— internal insulation of internal walls 80 mm,
— 2.BA: 470 m
— internal insulation of internal walls 50 mm,
— 2.BA: 100 m
— internal insulation of internal walls, ceiling strips 30 mm,
— 2.BA: 150 m
— reinforcement and surface plaster,
— 2.BA: 500 m
— interior plaster gypsum plaster B1 — walls (reinforced concrete and masonry),
— 2.BA: 1 000 m
— interior plaster gypsum plaster B1 — supports, supports including surface pre-treatment,
— 2.BA: 200 m
— Interior plaster lime cement plaster PII — walls including surface pretreatment,
— 2.BA: 75 m