This contract defines the conditions under which the CEA entrusts the Contractor, which accepts, to carry out detailed studies and manufacture ten (10) strongbacks within the framework of the PIP II project.
This consultation is broken down into 2 solutions as follows:
SOLUTION N°1: Design and manufacture of ten (10) strongbacks without the application of the surface treatment described in § 5.9 of the CoC.
SOLUTION N°2: Design and manufacture of ten (10) strongbacks with the application of the surface treatment described in § 5.9 of the CoC.
The services entrusted to the Account Holder are divided into three phases, a manufacturing design phase, a manufacturing phase for one (1) pre-production strongback and a manufacturing phase for nine (9) production strongbacks.
The three phases are detailed and will be carried out according to the modalities defined in the specifications.