Swissgrid is constructing a new GIS 220 kV building within the perimeter of the current Chamoson substation.
The purpose of this procedure is the following structural work:
- site installation as well as security measures;
- partial demolition of the 220 kV AIS fields;
- new construction of a GIS 220 kV building in the middle of the existing site, excavation work, bored pile work in reinforced concrete, exterior fittings;
- new construction of foundations for electrical appliances;
- earthing system;
- new construction of cable blocks;
- new construction of a foundation for the fence.
During construction work the following conditions must be observed:
- distances and barriers for work near 220 kV voltage;
- only one field can be out of service;
- construction machines with height limitation.
Swissgrid is constructing a new GIS 220 kV building within the perimeter of the current Chamoson substation.
The purpose of this procedure is the following structural work:
- site installation as well as security measures;
- partial demolition of the 220 kV AIS fields;
- new construction of a GIS 220 kV building in the middle of the existing site, excavation work, bored pile work in reinforced concrete, exterior fittings;
- new construction of foundations for electrical appliances;
- earthing system;
- new construction of cable blocks;
- new construction of a foundation for the fence.
During construction work the following conditions must be observed:
- distances and barriers for work near 220 kV voltage;
- only one field can be out of service;
- construction machines with height limitation.