"Successive supply of construction sands and aggregates" divided into two Lots: Part 1. Successive supply of sands Part 2. Successive delivery of construction aggregates
Successive Sands Delivery2. Detailed data of the subject of the contract and its scope are specified in Appendix No. 1 and Appendix No. 2 (forms "Offer") to the SWZ. The Ordering Party reserves the right to reduce the scope of the order (quantity) by a maximum of 20%. For failure to perform the entire subject of the contract, the Contractor will not be entitled to any claims for damages. 3. The delivered subject of the contract must meet the requirements of the standard: PN-EN 13043:2004 or PN-EN 13242 +A1:2010. 4. The delivered subject of the contract must have a declaration of performance. 5. Deliveries will be made successively in batches as needed, on the dates indicated by the Ordering Party on a working basis. The indication of the quantity and date will take place by phone at least 24 hours before the implementation of individual deliveries. Deliveries will be made by the Contractor between 700 and 1500. 6. Transport is provided by the Contractor. The Ordering Party requires that the subject of the contract be transported by dump trucks with a capacity of 25 t 15%. 7. Loading, transport and unloading shall be at the expense of the Contractor.
Successive delivery of construction aggregates2. Detailed data of the subject of the contract and its scope are specified in Appendix No. 1 and Appendix No. 2 (forms "Offer") to the SWZ. The Ordering Party reserves the right to reduce the scope of the order (quantity) by a maximum of 20%. For failure to perform the entire subject of the contract, the Contractor will not be entitled to any claims for damages. 3. The delivered subject of the contract must meet the requirements of the standard: PN-EN 13043:2004 or PN-EN 13242 +A1:2010. 4. The delivered subject of the contract must have a declaration of performance. 5. Deliveries will be made successively in batches as needed, on the dates indicated by the Ordering Party on a working basis. The indication of the quantity and date will take place by phone at least 24 hours before the implementation of individual deliveries. Deliveries will be made by the Contractor between 700 and 1500. 6. Transport is provided by the Contractor. The Ordering Party requires that the subject of the contract be transported by dump trucks with a capacity of 25 t 15%. 7. Loading, transport and unloading shall be at the expense of the Contractor.