Roof-framing work | Tenderlake

Roof-framing work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
10 February 2023
Closing Date:
29 March 2023
Location(s):
DE27B Ostallgäu (DE Germany/DEUTSCHLAND)
Description:
New construction of primary school St. Martin in Marktoberdorf, carpentry, plumbing and skylights

Lot 1

-approx. 255 m3 glulam Spruce supply, set, erect, lay (main beams, secondary beams, skylight beams) for roof construction of 4 clusters with 10 individual surfaces each, inclination 12.5 degrees

-approx. 11 m3 squared timber spruce supply, setting, installation, laying (e.g. support beams)

-approx. 140 locksmith-like connections/built-in parts/connections (slotted plates with base plates, partly 3-part, "star-shaped")

-approx. 1 roof hatch with lockable lid and scissor staircase

-various ancillary work (coatings,

-approx. 1,800 m2 roof formwork OSB/3 panels

-ca. 1,800 m2 kaltselbstklebende Polymerbitumen-Dampfsperrbahn

-approx. 13 temporary skylight covers as weather protection

Lot 2

-approx. 4 pcs skylights (aluminum) with opening wing, as 5-corner pyramid, approx. 5.5 m x 5.5 m

-approx. 4 pcs skylights (aluminum) with opening sash, trapezoidal, approx. 3 m x 1.2/2.8 m

-approx. 4 pcs skylights (aluminum), 4-cornered (unequal), approx. 1.5 m x 1.8 m

-approx. 1 pcs skylight (aluminum) with SHEV opening sash, trapezoidal, approx. 2.3 m x 1.7/1 m

-approx. 1,800 m2 metal roof with insulation, double steel steel rebate cover for roof surfaces of 4 clusters of 10 individual surfaces each, inclination 12.5 degrees

-ca. 170 m Firstausbildung

-ca. 200 m Kehlrinnenausbildung

-Sheet metal of the skylight upstands (approx. 14 pcs., see above)

-approx. 180 m stainless steel drainage downpipes with accessories and bends

-approx. 14 pcs. roof drains and 14 pcs. emergency drains with spear

-approx. 255 m attic cladding with insulation and substructure

-Rope safety system with corner and intermediate supports

-Electric gutter heating for throat gutters and downpipes

-Maintenance of skylights and metal roofing

LOT 1 - Carpentry and timber construction

Lot 1

-approx. 255 m3 glulam Spruce supply, set, erect, lay (main beams, secondary beams, skylight beams) for roof construction of 4 clusters with 10 individual surfaces each, inclination 12.5 degrees

-approx. 11 m3 squared timber spruce supply, setting, installation, laying (e.g. support beams)

-approx. 140 locksmith-like connections/built-in parts/connections (slotted plates with base plates, partly 3-part, "star-shaped")

-approx. 1 roof hatch with lockable lid and scissor staircase

-various ancillary work (coatings,

-approx. 1,800 m2 roof formwork OSB/3 panels

-ca. 1,800 m2 kaltselbstklebende Polymerbitumen-Dampfsperrbahn

-approx. 13 temporary skylight covers as weather protection

LOT 2 - Plumbing including skylights

Lot 2

-approx. 4 pcs skylights (aluminum) with opening wing, as 5-corner pyramid, approx. 5.5 m x 5.5 m

-approx. 4 pcs skylights (aluminum) with opening sash, trapezoidal, approx. 3 m x 1.2/2.8 m

-approx. 4 pcs skylights (aluminum), 4-cornered (unequal), approx. 1.5 m x 1.8 m

-approx. 1 pcs skylight (aluminum) with SHEV opening sash, trapezoidal, approx. 2.3 m x 1.7/1 m

-approx. 1,800 m2 metal roof with insulation, double steel steel rebate cover for roof surfaces of 4 clusters of 10 individual surfaces each, inclination 12.5 degrees

-ca. 170 m Firstausbildung

-ca. 200 m Kehlrinnenausbildung

-Sheet metal of the skylight upstands (approx. 14 pcs., see above)

-approx. 180 m stainless steel drainage downpipes with accessories and bends

-approx. 14 pcs. roof drains and 14 pcs. emergency drains with spear

-approx. 255 m attic cladding with insulation and substructure

-Rope safety system with corner and intermediate supports

-Electric gutter heating for throat gutters and downpipes

-Maintenance of skylights and metal roofing

Download full details as .pdf
The Buyer:
Stadt Marktoberdorf
CPV Code(s):
44115400 - Skylights
45261100 - Roof-framing work
45261300 - Flashing and guttering work
45422000 - Carpentry installation work