Lot 1
-approx. 255 m3 glulam Spruce supply, set, erect, lay (main beams, secondary beams, skylight beams) for roof construction of 4 clusters with 10 individual surfaces each, inclination 12.5 degrees
-approx. 11 m3 squared timber spruce supply, setting, installation, laying (e.g. support beams)
-approx. 140 locksmith-like connections/built-in parts/connections (slotted plates with base plates, partly 3-part, "star-shaped")
-approx. 1 roof hatch with lockable lid and scissor staircase
-various ancillary work (coatings,
-approx. 1,800 m2 roof formwork OSB/3 panels
-ca. 1,800 m2 kaltselbstklebende Polymerbitumen-Dampfsperrbahn
-approx. 13 temporary skylight covers as weather protection
Lot 2
-approx. 4 pcs skylights (aluminum) with opening wing, as 5-corner pyramid, approx. 5.5 m x 5.5 m
-approx. 4 pcs skylights (aluminum) with opening sash, trapezoidal, approx. 3 m x 1.2/2.8 m
-approx. 4 pcs skylights (aluminum), 4-cornered (unequal), approx. 1.5 m x 1.8 m
-approx. 1 pcs skylight (aluminum) with SHEV opening sash, trapezoidal, approx. 2.3 m x 1.7/1 m
-approx. 1,800 m2 metal roof with insulation, double steel steel rebate cover for roof surfaces of 4 clusters of 10 individual surfaces each, inclination 12.5 degrees
-ca. 170 m Firstausbildung
-ca. 200 m Kehlrinnenausbildung
-Sheet metal of the skylight upstands (approx. 14 pcs., see above)
-approx. 180 m stainless steel drainage downpipes with accessories and bends
-approx. 14 pcs. roof drains and 14 pcs. emergency drains with spear
-approx. 255 m attic cladding with insulation and substructure
-Rope safety system with corner and intermediate supports
-Electric gutter heating for throat gutters and downpipes
-Maintenance of skylights and metal roofing
LOT 1 - Carpentry and timber constructionLot 1
-approx. 255 m3 glulam Spruce supply, set, erect, lay (main beams, secondary beams, skylight beams) for roof construction of 4 clusters with 10 individual surfaces each, inclination 12.5 degrees
-approx. 11 m3 squared timber spruce supply, setting, installation, laying (e.g. support beams)
-approx. 140 locksmith-like connections/built-in parts/connections (slotted plates with base plates, partly 3-part, "star-shaped")
-approx. 1 roof hatch with lockable lid and scissor staircase
-various ancillary work (coatings,
-approx. 1,800 m2 roof formwork OSB/3 panels
-ca. 1,800 m2 kaltselbstklebende Polymerbitumen-Dampfsperrbahn
-approx. 13 temporary skylight covers as weather protection
LOT 2 - Plumbing including skylightsLot 2
-approx. 4 pcs skylights (aluminum) with opening wing, as 5-corner pyramid, approx. 5.5 m x 5.5 m
-approx. 4 pcs skylights (aluminum) with opening sash, trapezoidal, approx. 3 m x 1.2/2.8 m
-approx. 4 pcs skylights (aluminum), 4-cornered (unequal), approx. 1.5 m x 1.8 m
-approx. 1 pcs skylight (aluminum) with SHEV opening sash, trapezoidal, approx. 2.3 m x 1.7/1 m
-approx. 1,800 m2 metal roof with insulation, double steel steel rebate cover for roof surfaces of 4 clusters of 10 individual surfaces each, inclination 12.5 degrees
-ca. 170 m Firstausbildung
-ca. 200 m Kehlrinnenausbildung
-Sheet metal of the skylight upstands (approx. 14 pcs., see above)
-approx. 180 m stainless steel drainage downpipes with accessories and bends
-approx. 14 pcs. roof drains and 14 pcs. emergency drains with spear
-approx. 255 m attic cladding with insulation and substructure
-Rope safety system with corner and intermediate supports
-Electric gutter heating for throat gutters and downpipes
-Maintenance of skylights and metal roofing