Supply of material for a 110 kV line
The Kiel Nord power grid will be upgraded. The work is to be implemented in three phases.
The cable must comply with VDE standard 0276-632 and is to be delivered in three different lengths on three different delivery dates. Total length about 30,000 meters. The exact lengths will be abandoned with the simultaneous planning. First delivery date is scheduled for the 4th quarter of 2023. The two other deliveries are expected to take place within the next 12 months.
A division of the delivery into a total of three delivery dates is included in the evaluation matrix and becomes part of performance.
Rental cable drums can be returned. The return should be free of charge up to 18 months after delivery.
A delivery on disposable drums is included in the evaluation matrix and becomes part of the performance.