Group 1 – Dairy
Group 2 – Ported dairy
Group 3 – Vegetables
Group 4 – Fruit
Group 5 — Edible potatoes
Group 6 – Frozen food
Group 7 — Chicken eggs
Group 8 — Miscellaneous foodstuffs
Group 9 – Juices
Group 10 – Loose food products
Group 1Group 1 – Dairy
Bid evaluation criteria
In the description of the subject matter of the contract, the Contracting Authority specified the quality standards relating to the type of delivery, established the rules for the performance of the contract and imposed the requirements that the Contractor must meet.
Criterion name Criterion weight
Price 100%
How offers are evaluated:
Criterion: price – indicator C, will be calculated according to the formula:
C=(Cn/Cb)x100
Where:
Cn – gross price of the cheapest offer,
Cb – gross price of the examined offer.
As part of the "price" criterion, the contractor may receive a maximum of 100 points = 100%.
Attention:
The tender evaluation criterion will be calculated with an accuracy of two decimal places in accordance with the mathematical rules of rounding numbers, i.e.: if the third digit after the decimal point is equal to 5 or more, it will be rounded up, if the third digit after the decimal point is less than 5, it will be rounded down. The proper rounding of the numbers referred to in the preceding sentence will take place after all the mathematical operations specified in the formula have been performed, i.e. after calculating the final result of a given criterion. The Contracting Authority shall award a public contract to the Contractor whose bid meets the conditions set out in the Terms of Reference and has been assessed as the most advantageous (received the highest number of percent).
The Contracting Authority shall exclude the Contractors on the basis of:
- Article 108(1) of the Public Procurement Law,
- Article 7(1) of the Act of 13 April 2022 on special solutions for counteracting support for aggression against Ukraine and serving to protect national security,
- Article 5k of Council Regulation (EU) No 833/2014 of 31 July 2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine. EU No L 229, 31.7.2014, p. 1), hereinafter: Regulation 833/2014, as amended by Council Regulation (EU) 2022/576 amending Regulation (EU) No 833/2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine (OJ L 229, p. 1). EU No L 111, 8.4.2022, p. 1), hereinafter: Regulation 2022/576.
2. The Contracting Authority shall additionally exclude the Contractor pursuant to Article 109(1)(4) of the Public Procurement Law.
Details of the grounds for exclusion referred to above are set out in the SWZ - Chapter XX - located on the website at: https://platformazakupowa.pl/pn/biziel_umk/proceedings.
Group 10Group 10 – Loose food products
Bid evaluation criteria
In the description of the subject matter of the contract, the Contracting Authority specified the quality standards relating to the type of delivery, established the rules for the performance of the contract and imposed the requirements that the Contractor must meet.
Criterion name Criterion weight
Price 100%
How offers are evaluated:
Criterion: price – indicator C, will be calculated according to the formula:
C=(Cn/Cb)x100
Where:
Cn – gross price of the cheapest offer,
Cb – gross price of the examined offer.
As part of the "price" criterion, the contractor may receive a maximum of 100 points = 100%.
Attention:
The tender evaluation criterion will be calculated with an accuracy of two decimal places in accordance with the mathematical rules of rounding numbers, i.e.: if the third digit after the decimal point is equal to 5 or more, it will be rounded up, if the third digit after the decimal point is less than 5, it will be rounded down. The proper rounding of the numbers referred to in the preceding sentence will take place after all the mathematical operations specified in the formula have been performed, i.e. after calculating the final result of a given criterion. The Contracting Authority shall award a public contract to the Contractor whose bid meets the conditions set out in the Terms of Reference and has been assessed as the most advantageous (received the highest number of percent).
The Contracting Authority shall exclude the Contractors on the basis of:
- Article 108(1) of the Public Procurement Law,
- Article 7(1) of the Act of 13 April 2022 on special solutions for counteracting support for aggression against Ukraine and serving to protect national security,
- Article 5k of Council Regulation (EU) No 833/2014 of 31 July 2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine. EU No L 229, 31.7.2014, p. 1), hereinafter: Regulation 833/2014, as amended by Council Regulation (EU) 2022/576 amending Regulation (EU) No 833/2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine (OJ L 229, p. 1). EU No L 111, 8.4.2022, p. 1), hereinafter: Regulation 2022/576.
2. The Contracting Authority shall additionally exclude the Contractor pursuant to Article 109(1)(4) of the Public Procurement Law.
Details of the grounds for exclusion referred to above are set out in the SWZ - Chapter XX - located on the website at: https://platformazakupowa.pl/pn/biziel_umk/proceedings.
Group 2Group 2 – Ported dairy
Bid evaluation criteria
In the description of the subject matter of the contract, the Contracting Authority specified the quality standards relating to the type of delivery, established the rules for the performance of the contract and imposed the requirements that the Contractor must meet.
Criterion name Criterion weight
Price 100%
How offers are evaluated:
Criterion: price – indicator C, will be calculated according to the formula:
C=(Cn/Cb)x100
Where:
Cn – gross price of the cheapest offer,
Cb – gross price of the examined offer.
As part of the "price" criterion, the contractor may receive a maximum of 100 points = 100%.
Attention:
The tender evaluation criterion will be calculated with an accuracy of two decimal places in accordance with the mathematical rules of rounding numbers, i.e.: if the third digit after the decimal point is equal to 5 or more, it will be rounded up, if the third digit after the decimal point is less than 5, it will be rounded down. The proper rounding of the numbers referred to in the preceding sentence will take place after all the mathematical operations specified in the formula have been performed, i.e. after calculating the final result of a given criterion. The Contracting Authority shall award a public contract to the Contractor whose bid meets the conditions set out in the Terms of Reference and has been assessed as the most advantageous (received the highest number of percent).
The Contracting Authority shall exclude the Contractors on the basis of:
- Article 108(1) of the Public Procurement Law,
- Article 7(1) of the Act of 13 April 2022 on special solutions for counteracting support for aggression against Ukraine and serving to protect national security,
- Article 5k of Council Regulation (EU) No 833/2014 of 31 July 2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine. EU No L 229, 31.7.2014, p. 1), hereinafter: Regulation 833/2014, as amended by Council Regulation (EU) 2022/576 amending Regulation (EU) No 833/2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine (OJ L 229, p. 1). EU No L 111, 8.4.2022, p. 1), hereinafter: Regulation 2022/576.
2. The Contracting Authority shall additionally exclude the Contractor pursuant to Article 109(1)(4) of the Public Procurement Law.
Details of the grounds for exclusion referred to above are set out in the SWZ - Chapter XX - located on the website at: https://platformazakupowa.pl/pn/biziel_umk/proceedings.
Group 3Group 3 – Vegetables
Bid evaluation criteria
In the description of the subject matter of the contract, the Contracting Authority specified the quality standards relating to the type of delivery, established the rules for the performance of the contract and imposed the requirements that the Contractor must meet.
Criterion name Criterion weight
Price 100%
How offers are evaluated:
Criterion: price – indicator C, will be calculated according to the formula:
C=(Cn/Cb)x100
Where:
Cn – gross price of the cheapest offer,
Cb – gross price of the examined offer.
As part of the "price" criterion, the contractor may receive a maximum of 100 points = 100%.
Attention:
The tender evaluation criterion will be calculated with an accuracy of two decimal places in accordance with the mathematical rules of rounding numbers, i.e.: if the third digit after the decimal point is equal to 5 or more, it will be rounded up, if the third digit after the decimal point is less than 5, it will be rounded down. The proper rounding of the numbers referred to in the preceding sentence will take place after all the mathematical operations specified in the formula have been performed, i.e. after calculating the final result of a given criterion. The Contracting Authority shall award a public contract to the Contractor whose bid meets the conditions set out in the Terms of Reference and has been assessed as the most advantageous (received the highest number of percent).
The Contracting Authority shall exclude the Contractors on the basis of:
- Article 108(1) of the Public Procurement Law,
- Article 7(1) of the Act of 13 April 2022 on special solutions for counteracting support for aggression against Ukraine and serving to protect national security,
- Article 5k of Council Regulation (EU) No 833/2014 of 31 July 2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine. EU No L 229, 31.7.2014, p. 1), hereinafter: Regulation 833/2014, as amended by Council Regulation (EU) 2022/576 amending Regulation (EU) No 833/2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine (OJ L 229, p. 1). EU No L 111, 8.4.2022, p. 1), hereinafter: Regulation 2022/576.
2. The Contracting Authority shall additionally exclude the Contractor pursuant to Article 109(1)(4) of the Public Procurement Law.
Details of the grounds for exclusion referred to above are set out in the SWZ - Chapter XX - located on the website at: https://platformazakupowa.pl/pn/biziel_umk/proceedings.
Group 4Group 4 – Fruit
Bid evaluation criteria
In the description of the subject matter of the contract, the Contracting Authority specified the quality standards relating to the type of delivery, established the rules for the performance of the contract and imposed the requirements that the Contractor must meet.
Criterion name Criterion weight
Price 100%
How offers are evaluated:
Criterion: price – indicator C, will be calculated according to the formula:
C=(Cn/Cb)x100
Where:
Cn – gross price of the cheapest offer,
Cb – gross price of the examined offer.
As part of the "price" criterion, the contractor may receive a maximum of 100 points = 100%.
Attention:
The tender evaluation criterion will be calculated with an accuracy of two decimal places in accordance with the mathematical rules of rounding numbers, i.e.: if the third digit after the decimal point is equal to 5 or more, it will be rounded up, if the third digit after the decimal point is less than 5, it will be rounded down. The proper rounding of the numbers referred to in the preceding sentence will take place after all the mathematical operations specified in the formula have been performed, i.e. after calculating the final result of a given criterion. The Contracting Authority shall award a public contract to the Contractor whose bid meets the conditions set out in the Terms of Reference and has been assessed as the most advantageous (received the highest number of percent).
The Contracting Authority shall exclude the Contractors on the basis of:
- Article 108(1) of the Public Procurement Law,
- Article 7(1) of the Act of 13 April 2022 on special solutions for counteracting support for aggression against Ukraine and serving to protect national security,
- Article 5k of Council Regulation (EU) No 833/2014 of 31 July 2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine. EU No L 229, 31.7.2014, p. 1), hereinafter: Regulation 833/2014, as amended by Council Regulation (EU) 2022/576 amending Regulation (EU) No 833/2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine (OJ L 229, p. 1). EU No L 111, 8.4.2022, p. 1), hereinafter: Regulation 2022/576.
2. The Contracting Authority shall additionally exclude the Contractor pursuant to Article 109(1)(4) of the Public Procurement Law.
Details of the grounds for exclusion referred to above are set out in the SWZ - Chapter XX - located on the website at: https://platformazakupowa.pl/pn/biziel_umk/proceedings.
Group 5Group 5 — Edible potatoes
Bid evaluation criteria
In the description of the subject matter of the contract, the Contracting Authority specified the quality standards relating to the type of delivery, established the rules for the performance of the contract and imposed the requirements that the Contractor must meet.
Criterion name Criterion weight
Price 100%
How offers are evaluated:
Criterion: price – indicator C, will be calculated according to the formula:
C=(Cn/Cb)x100
Where:
Cn – gross price of the cheapest offer,
Cb – gross price of the examined offer.
As part of the "price" criterion, the contractor may receive a maximum of 100 points = 100%.
Attention:
The tender evaluation criterion will be calculated with an accuracy of two decimal places in accordance with the mathematical rules of rounding numbers, i.e.: if the third digit after the decimal point is equal to 5 or more, it will be rounded up, if the third digit after the decimal point is less than 5, it will be rounded down. The proper rounding of the numbers referred to in the preceding sentence will take place after all the mathematical operations specified in the formula have been performed, i.e. after calculating the final result of a given criterion. The Contracting Authority shall award a public contract to the Contractor whose bid meets the conditions set out in the Terms of Reference and has been assessed as the most advantageous (received the highest number of percent).
The Contracting Authority shall exclude the Contractors on the basis of:
- Article 108(1) of the Public Procurement Law,
- Article 7(1) of the Act of 13 April 2022 on special solutions for counteracting support for aggression against Ukraine and serving to protect national security,
- Article 5k of Council Regulation (EU) No 833/2014 of 31 July 2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine. EU No L 229, 31.7.2014, p. 1), hereinafter: Regulation 833/2014, as amended by Council Regulation (EU) 2022/576 amending Regulation (EU) No 833/2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine (OJ L 229, p. 1). EU No L 111, 8.4.2022, p. 1), hereinafter: Regulation 2022/576.
2. The Contracting Authority shall additionally exclude the Contractor pursuant to Article 109(1)(4) of the Public Procurement Law.
Details of the grounds for exclusion referred to above are set out in the SWZ - Chapter XX - located on the website at: https://platformazakupowa.pl/pn/biziel_umk/proceedings.
Group 6Group 6 – Frozen food
Bid evaluation criteria
In the description of the subject matter of the contract, the Contracting Authority specified the quality standards relating to the type of delivery, established the rules for the performance of the contract and imposed the requirements that the Contractor must meet.
Criterion name Criterion weight
Price 100%
How offers are evaluated:
Criterion: price – indicator C, will be calculated according to the formula:
C=(Cn/Cb)x100
Where:
Cn – gross price of the cheapest offer,
Cb – gross price of the examined offer.
As part of the "price" criterion, the contractor may receive a maximum of 100 points = 100%.
Attention:
The tender evaluation criterion will be calculated with an accuracy of two decimal places in accordance with the mathematical rules of rounding numbers, i.e.: if the third digit after the decimal point is equal to 5 or more, it will be rounded up, if the third digit after the decimal point is less than 5, it will be rounded down. The proper rounding of the numbers referred to in the preceding sentence will take place after all the mathematical operations specified in the formula have been performed, i.e. after calculating the final result of a given criterion. The Contracting Authority shall award a public contract to the Contractor whose bid meets the conditions set out in the Terms of Reference and has been assessed as the most advantageous (received the highest number of percent).
The Contracting Authority shall exclude the Contractors on the basis of:
- Article 108(1) of the Public Procurement Law,
- Article 7(1) of the Act of 13 April 2022 on special solutions for counteracting support for aggression against Ukraine and serving to protect national security,
- Article 5k of Council Regulation (EU) No 833/2014 of 31 July 2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine. EU No L 229, 31.7.2014, p. 1), hereinafter: Regulation 833/2014, as amended by Council Regulation (EU) 2022/576 amending Regulation (EU) No 833/2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine (OJ L 229, p. 1). EU No L 111, 8.4.2022, p. 1), hereinafter: Regulation 2022/576.
2. The Contracting Authority shall additionally exclude the Contractor pursuant to Article 109(1)(4) of the Public Procurement Law.
Details of the grounds for exclusion referred to above are set out in the SWZ - Chapter XX - located on the website at: https://platformazakupowa.pl/pn/biziel_umk/proceedings.
Group 7Group 7 — Chicken eggs
Bid evaluation criteria
In the description of the subject matter of the contract, the Contracting Authority specified the quality standards relating to the type of delivery, established the rules for the performance of the contract and imposed the requirements that the Contractor must meet.
Criterion name Criterion weight
Price 100%
How offers are evaluated:
Criterion: price – indicator C, will be calculated according to the formula:
C=(Cn/Cb)x100
Where:
Cn – gross price of the cheapest offer,
Cb – gross price of the examined offer.
As part of the "price" criterion, the contractor may receive a maximum of 100 points = 100%.
Attention:
The tender evaluation criterion will be calculated with an accuracy of two decimal places in accordance with the mathematical rules of rounding numbers, i.e.: if the third digit after the decimal point is equal to 5 or more, it will be rounded up, if the third digit after the decimal point is less than 5, it will be rounded down. The proper rounding of the numbers referred to in the preceding sentence will take place after all the mathematical operations specified in the formula have been performed, i.e. after calculating the final result of a given criterion. The Contracting Authority shall award a public contract to the Contractor whose bid meets the conditions set out in the Terms of Reference and has been assessed as the most advantageous (received the highest number of percent).
The Contracting Authority shall exclude the Contractors on the basis of:
- Article 108(1) of the Public Procurement Law,
- Article 7(1) of the Act of 13 April 2022 on special solutions for counteracting support for aggression against Ukraine and serving to protect national security,
- Article 5k of Council Regulation (EU) No 833/2014 of 31 July 2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine. EU No L 229, 31.7.2014, p. 1), hereinafter: Regulation 833/2014, as amended by Council Regulation (EU) 2022/576 amending Regulation (EU) No 833/2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine (OJ L 229, p. 1). EU No L 111, 8.4.2022, p. 1), hereinafter: Regulation 2022/576.
2. The Contracting Authority shall additionally exclude the Contractor pursuant to Article 109(1)(4) of the Public Procurement Law.
Details of the grounds for exclusion referred to above are set out in the SWZ - Chapter XX - located on the website at: https://platformazakupowa.pl/pn/biziel_umk/proceedings.
Group 8Group 8 — Miscellaneous foodstuffs
Bid evaluation criteria
In the description of the subject matter of the contract, the Contracting Authority specified the quality standards relating to the type of delivery, established the rules for the performance of the contract and imposed the requirements that the Contractor must meet.
Criterion name Criterion weight
Price 100%
How offers are evaluated:
Criterion: price – indicator C, will be calculated according to the formula:
C=(Cn/Cb)x100
Where:
Cn – gross price of the cheapest offer,
Cb – gross price of the examined offer.
As part of the "price" criterion, the contractor may receive a maximum of 100 points = 100%.
Attention:
The tender evaluation criterion will be calculated with an accuracy of two decimal places in accordance with the mathematical rules of rounding numbers, i.e.: if the third digit after the decimal point is equal to 5 or more, it will be rounded up, if the third digit after the decimal point is less than 5, it will be rounded down. The proper rounding of the numbers referred to in the preceding sentence will take place after all the mathematical operations specified in the formula have been performed, i.e. after calculating the final result of a given criterion. The Contracting Authority shall award a public contract to the Contractor whose bid meets the conditions set out in the Terms of Reference and has been assessed as the most advantageous (received the highest number of percent).
The Contracting Authority shall exclude the Contractors on the basis of:
- Article 108(1) of the Public Procurement Law,
- Article 7(1) of the Act of 13 April 2022 on special solutions for counteracting support for aggression against Ukraine and serving to protect national security,
- Article 5k of Council Regulation (EU) No 833/2014 of 31 July 2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine. EU No L 229, 31.7.2014, p. 1), hereinafter: Regulation 833/2014, as amended by Council Regulation (EU) 2022/576 amending Regulation (EU) No 833/2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine (OJ L 229, p. 1). EU No L 111, 8.4.2022, p. 1), hereinafter: Regulation 2022/576.
2. The Contracting Authority shall additionally exclude the Contractor pursuant to Article 109(1)(4) of the Public Procurement Law.
Details of the grounds for exclusion referred to above are set out in the SWZ - Chapter XX - located on the website at: https://platformazakupowa.pl/pn/biziel_umk/proceedings.
Group 9Group 9 – Juices
Bid evaluation criteria
In the description of the subject matter of the contract, the Contracting Authority specified the quality standards relating to the type of delivery, established the rules for the performance of the contract and imposed the requirements that the Contractor must meet.
Criterion name Criterion weight
Price 100%
How offers are evaluated:
Criterion: price – indicator C, will be calculated according to the formula:
C=(Cn/Cb)x100
Where:
Cn – gross price of the cheapest offer,
Cb – gross price of the examined offer.
As part of the "price" criterion, the contractor may receive a maximum of 100 points = 100%.
Attention:
The tender evaluation criterion will be calculated with an accuracy of two decimal places in accordance with the mathematical rules of rounding numbers, i.e.: if the third digit after the decimal point is equal to 5 or more, it will be rounded up, if the third digit after the decimal point is less than 5, it will be rounded down. The proper rounding of the numbers referred to in the preceding sentence will take place after all the mathematical operations specified in the formula have been performed, i.e. after calculating the final result of a given criterion. The Contracting Authority shall award a public contract to the Contractor whose bid meets the conditions set out in the Terms of Reference and has been assessed as the most advantageous (received the highest number of percent).
The Contracting Authority shall exclude the Contractors on the basis of:
- Article 108(1) of the Public Procurement Law,
- Article 7(1) of the Act of 13 April 2022 on special solutions for counteracting support for aggression against Ukraine and serving to protect national security,
- Article 5k of Council Regulation (EU) No 833/2014 of 31 July 2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine. EU No L 229, 31.7.2014, p. 1), hereinafter: Regulation 833/2014, as amended by Council Regulation (EU) 2022/576 amending Regulation (EU) No 833/2014 concerning restrictive measures in view of Russia's actions destabilising the situation in Ukraine (OJ L 229, p. 1). EU No L 111, 8.4.2022, p. 1), hereinafter: Regulation 2022/576.
2. The Contracting Authority shall additionally exclude the Contractor pursuant to Article 109(1)(4) of the Public Procurement Law.
Details of the grounds for exclusion referred to above are set out in the SWZ - Chapter XX - located on the website at: https://platformazakupowa.pl/pn/biziel_umk/proceedings.