HOWOGE Wohnungsbaugesellschaft mbH intends to renovate the energy-efficient semi-residential high-rise at Rhinstraße 2/4, 10315 Berlin.
Semi-detached high-rise building type WHH GT 18/21 (Berlin)
Year of construction: 1984
Building parts / staircases: 1 residential high-rise with 2 staircases
Building height: up to 66.80 m above OK site
Number of floors: ground floor and 18 or 21 upper floors
Number of apartments: 296 pieces
Number of commercial units: 4 units
The building was last renovated around 2001.
- 14.450 m2 Arbeitsgerüst
- 6 Aufzugsbühnen
- 2,030 pieces of weathershell anchors
- 11,000 m2 of façade insulation as doubling
- 9,200 m2 curtain wall with clay brick cladding
- 1,340 m2 curtain wall with photovoltaic module cladding as BIPV, complete incl. inverter
- 240 m2 curtain wall with glass façade panel cladding
- 265 permanent scaffolding anchors
- 57 pieces of balcony balustrade new, with photovoltaic module cladding as BIPV
- Rework 93 balcony balustrades
- Renovate 150 loggias (concrete renovation / floor coating / revision of existing ETICS)
- Revision of 400 m2 ETICS existing building (façades, nacelles on roof)
- Revision of 790 m2 ETICS stock (facades on the ground floor)
- Rework 35 pieces of steel-glass façade door wall elements
- Renew 962 pieces of plastic insulating glass elements (window and balcony door elements)
- Renew 653 exhaust air elements (hygrometric) for central fan ventilation systems in bathrooms/kitchens
- Install 32 fire dampers
- 180 m spiral seam pipe DN 250 to DN 560, incl. insulation
- 8 central roof ventilation units with exhaust air heat pump
- 9,300 m of heating risers insulate inhabited apartments
- 6,900 m of climber line cladding (plastic) in inhabited dwellings
- Install 12 electronic controllers in existing system
- Installation of 138 thermostatic actuators in existing system
- Hydraulic balancing for existing heating systems
- Supply, install, connect and commission 1 air source heat pump (heating capacity 93 kW) with soundproofing housing
- Completely renew 1 elevator system (1.20 x 1.20 m, 680 kg, 8 persons, 18 stops, lifting height 48.92 m)
- Completely renew 1 lift system (1.20 x 2.10 m, 1,150 kg, 15 people, 18 stops, lifting height 48.92 m)
- Completely renew 1 lift system (1.20 x 1.20 m, 680 kg, 8 persons, 21 stops, lifting height 60.12 m)
- Completely renew 1 lift system (1.20 x 2.10 m, 1,150 kg, 15 people, 21 stops, lifting height 60.12 m)
- 50 pieces of basic cleaning stairwell, 19 floors
- 50 pieces of basic cleaning stairwell 22 floors
- 50 pieces of basic cleaning of common areas on the ground floor
- 5,000 m2 basic cleaning on the ground floor
- 220 hours of clearing outdoor facilities
- 20 pieces of mixed rubble container 5 m3
- 1 piece of fine cleaning stairwell 19 floors
- 1 piece of fine cleaning stairwell 22 storeys
- 1 piece of fine cleaning of common areas on the ground floor
- 525 m2 fine cleaning ancillary rooms/technical rooms on the ground floor
- Finely clean 600 m2 metal-glass wall/window/door elements on both sides
- Clearing 13 trees
- Harvest 200 shrubs
- Remove / store 28 posts and 25 fence panels
- Dismantle / dispose of 2 tons of foundations
- 1,200 m3 of soil excavation / soil removal
- Dispose of 1,350 t of excavated soil
- Construct 2,250 m2 of paved paths, including substructure and edging
- 54 m L-shaped concrete bracket (55 cm to 255 cm high) delivering, erecting, backfilling
- Deliver and erect 63 m bar mesh fence
- Erect 60 m bar mesh fence
- Lighting (8 lights) for garbage yard ran and install
- 2200 m2 of planting and vegetation areas to be revised and created
- Deliver and plant 14 deciduous trees
- Deliver and plant 60 solitary trees and shrubs
- Deliver and plant 100 pieces of shrubs
- Supply and plant 400 m2 of woody and perennial plants
- 1.400 m2 Rasenansaat
- Fertigstellungspflege
- 113 pieces T30-RS fire door new
- 6 pieces T90-RS fire door new
- 12 m2 aluminium-glass partition wall door element F90/T90-RS new
- 39 pieces of aluminium-glass exterior wall door elements (approx. 9 m2) RS new
- 140 m2 mullion-transom façade (distributed over 11 wall elements)
- 8 t steel supporting structure for ventilation systems on roofs
- 1,400 m2 roof renovation membrane, including subsoil preparation
- Deliver and install 50 roof anchor points
- Train 10 emergency drainage drains
- Renovate 10 roof drainage drains
- 277 m renewal of the roof edge profile