House 46, new building of the Centre for Mental Health (ZSG), Lot 3250 - connecting bridge
Steel construction work for the production of connecting bridge between the existing building and the new building Building 46 - Center for Mental Health, Center for Healthy Aging and Laboratory Diagnostic Center UKD Execution of steel construction and reinforced concrete composite work on the new building House 46 - Center for Mental Health, in the outdoor space, the execution class EXC2 or higher
- Load-bearing steel profiles, open and closed cross-sections, protected from weather approx. 12.0 t
- Load-bearing steel profiles, open and closed cross-sections, hot-dip galvanized approx. 8.0 t
- Thermal breaks approx. 8 pcs
- Steel support, multi-part, construction site welding approx. 8 pcs
- Stahlbetonverbunddecke ca. 105 m²
- Stahltrapezblech ca. 35 m²
- Canopy, overhead glazing, on slopes, mullion-transom façade system approx. 35 m²
- Sheeting, up to 60cm wide approx. 30 m
Documents to be submitted with the course:
- Proof of execution class EXC 3, alternatively EXC2 bridge construction comparable to reference verification