The subject of the order is "Delivery of endoprostheses".
A detailed description of the subject of the contract is contained in the contract template which is Annex 3 to the specification and a description of the subject of the contract which is Annex 6 to the specification.
Entries of the specification should be read together with any changes to the content of the specification, which are e.g. the result of replies to the Contractors' queries.
The Contractor is obliged to lodge a security deposit (before the submission deadline) in the amount of: for lot 1: PLN 10,000.00; for lot 2: PLN 4,000.00; for lot 3: PLN 7,500.00; for lot 4: PLN 730.00; for lot 5: PLN 19,000.00; for lot 6: PLN 1,700.00; for lot 7: PLN 2,800.00; for lot 8: PLN 380.00; for lot 9: PLN 710.00; for lot 10: PLN 470.00; for lot 11: PLN 75.00; for lot 12: PLN 37.00; for lot 13: PLN 370.00; for lot 14: PLN 230.00; for lot 15: PLN 2,300.00; for lots 16: PLN 130.00, for lots 17: PLN 430.00 The form of payment of the bid security has been described in the ToR.
Part 1. Hip endoprosthesis
Task 1. Cementless hip endoprosthesis polyethylene / ceramics - 200 pieces;
Task 2. Cementless hip joint endoprosthesis - two-mobile anti-luxation acetabulum - 10 pieces;
Task 3. Cemented hip arthroplasty - 120 pieces;
Task 4. Cemented hip joint endoprosthesis - two-mobile anti-luxation acetabulum - 5 pieces.
A detailed description of the subject of the contract is contained in the contract template which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. The provisions of the ToR should be read together with any changes to the content of the ToR, which are e.g. the result of the replies to the Contractors' queries.
In these proceedings, the Employer will apply Art. 24aa of the PPL Act.
Part 10: Temporary endoprostheses / spacer.
Task 1. Temporary endoprosthesis of the hip - 10 pieces;
Task 2. Temporary endoprosthesis of the knee - 10 pieces.
A detailed description of the subject of the contract is contained in the contract template which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. The provisions of the ToR should be read together with any changes to the content of the ToR, which are e.g. the result of the replies to the Contractors' queries.
In these proceedings, the Employer will apply Art. 24aa of the PPL Act.
Part 11: All-inside meniscus sewing kit.
All-inside meniscus sewing kit - 10 pieces.
A detailed description of the subject of the contract is contained in the contract template which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. The provisions of the ToR should be read together with any changes to the content of the ToR, which are e.g. the result of the replies to the Contractors' queries.
In these proceedings, the Employer will apply Art. 24aa of the PPL Act.
Part 12: Cannulated compression screw.
Cannulated compression screw - 15 pieces.
A detailed description of the subject of the contract is contained in the contract template which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. The provisions of the ToR should be read together with any changes to the content of the ToR, which are e.g. the result of the replies to the Contractors' queries.
In these proceedings, the Employer will apply Art. 24aa of the PPL Act.
Package 13: Half-knee endoprostheses.
Half knee endoprosthesis - 20 pieces.
A detailed description of the subject of the contract is contained in the contract template which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. The provisions of the ToR should be read together with any changes to the content of the ToR, which are e.g. the result of the replies to the Contractors' queries.
In these proceedings, the Employer will apply Art. 24aa of the PPL Act.
Part 14: Complementary items for the length of the mandrel neck of the hip endoprosthesis.
Additional elements.
Task 1. Standard cone reducer system for hip revision operations - 10 sets;
Task 2. A system of non-standard cone reducers for hip revision operations - 3 sets.
A detailed description of the subject of the contract is contained in the contract template which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. Entries of the specification should be read together with any changes to the content of the ToR, which are e.g. the result of replies to the Contractors' queries.
In these proceedings, the Employer will apply Art. 24aa of the PPL Act.
Part 15: Bone cements.
Task 1. Bone cement of medium viscosity with MA methyl methacrylate copolymer with addition of gentamicin - 500 pieces;
Task 2. Bone cement of medium viscosity with MA methyl methacrylate copolymer with gentamicin - 150 pieces;
Task 3. Revision bone cement with two active antibiotics - 200 pieces;
Task 4. Revision bone cement with two active antibiotics - 30 pieces;
Task 5. Reusable rinsing system based on the power of the rinsing stream - 200 items;
Task 6. Vacuum cement mixer - 150 pieces;
Task 7. Vacuum cement mixer - 100 pieces.
A detailed description of the subject of the contract is contained in the contract template which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. Entries of the specification should be read together with any changes to the content of the ToR, which are e.g. the result of replies to the Contractors' queries.
In these proceedings, the Employer will apply Art. 24aa of the PPL Act.
Part 16: Test for detecting human alphadefensins.
Test used to detect human alphadefensins - 20 pieces.
A detailed description of the subject of the contract is contained in the contract template which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. The provisions of the ToR should be read together with any changes to the content of the ToR, which are e.g. the result of the replies to the Contractors' queries.
In these proceedings, the Employer will apply Art. 24aa of the PPL Act.
Anchors for reconstruction operations.
Task 1. Titanium anchor for reconstruction of rotator cone - 20 pieces;
Task 2. Titanium anchor for reconstruction of rotator cuff - 10 pieces;
Task 3. Titanium anchor for labrum reconstruction - 20 pieces;
Task 4 Soft string anchor for labrum reconstruction - 15 pieces;
Task 5. A disposable set for implanting a soft string anchor - 4 pieces;
Task 6. Titanium anchor dedicated to small bone procedures - 10 pieces.
A detailed description of the subject of the contract is contained in the contract template which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. The provisions of the ToR should be read together with any changes to the content of the ToR, which are e.g. the result of the replies to the Contractors' queries.
In these proceedings, the Employer will apply Art. 24aa of the PPL Act.
Part 2. Revision hip replacement.
Task 1. Modular revision hip replacement - 25 pieces;
Task 2. Cemented revision hip prosthesis - 15 pieces;
Task 3: Inspection cups - 30 pieces;
Task 4. Resistance inspection bin - 8 pieces;
Task 5. Tapes or cables - 30 pieces ..
A detailed description of the subject of the contract is contained in the contract template which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. The provisions of the ToR should be read together with any changes to the content of the ToR, which are e.g. the result of the replies to the Contractors' queries.
In these proceedings, the Employer will apply Art. 24aa of the PPL Act.
Part 3. Przybasadowe hip hip prostheses.
Task 1. Pituitary endoprosthesis / ceramics-polyethylene / - 110 pieces;
Task 2. Pituitary endoprosthesis / ceramics-ceramics / - 40 pieces.
A detailed description of the subject of the contract is contained in the contract template which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. The provisions of the ToR should be read together with any changes to the content of the ToR, which are e.g. the result of the replies to the Contractors' queries.
In these proceedings, the Employer will apply Art. 24aa of the PPL Act.
Part 4: Non-modular revision mandrels.
Non-modular non-modular Wagner revision mandrel - 20 pieces.
A detailed description of the subject of the contract is contained in the contract template which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. The provisions of the ToR should be read together with any changes to the content of the ToR, which are e.g. the result of the replies to the Contractors' queries.
In these proceedings, the Employer will apply Art. 24aa of the PPL Act.
Part 5: Knee endoprosthesis.
Task 1. Cemented knee arthroplasty - 220 pieces;
Task 2. Knee joint endoprosthesis with a polyethylene tibial element - 130 pieces;
Task 3. Revision knee revision prosthesis with complementary cuffs, compatible with the primary endoprosthesis system - 20 pieces;
Task 4. Revision knee revision prosthesis with supplementary cuffs - 10 pieces;
Task 5. Modular prostheses enabling resection of the entire femur - 1 piece ..
A detailed description of the subject of the contract is contained in the contract template which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. The provisions of the ToR should be read together with any changes to the content of the ToR, which are e.g. the result of the replies to the Contractors' queries.
In these proceedings, the Employer will apply Art. 24aa of the PPL Act.
Part 6: Total knee prosthesis, anatomic.
Total knee joint prosthesis, anatomical - 50 pieces.
A detailed description of the subject of the contract is contained in the contract template which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. The provisions of the ToR should be read together with any changes to the content of the ToR, which are e.g. the result of the replies to the Contractors' queries.
In these proceedings, the Employer will apply Art. 24aa of the PPL Act.
Part 7: Revision bushing with offset.
Task 1. Press-fit cup - 30 pieces;
Task 2. Three-dimensional augment made of titanium alloy compatible with the revision cup - 10 pieces;
Task 3. Metal insert for revision pan - 25 pieces;
Task 4. A dual mobility polyethylene head - 5 pieces;
Task 5. Smooth metal polished insert under the head dual mobility - 5 pieces;
Task 6. Biolox ceramic delta inspection head with metal collar - 10 pieces;
Task 7. Metal head - 20 pieces;
Task 8. Neutral and offset polyethylene insert - 20 pieces;
Task 9. Ceramic insert - 5 pieces.
A detailed description of the subject of the contract is contained in the contract template which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. Entries of the specification should be read together with any changes to the content of the ToR, which are e.g. the result of replies to the Contractors' queries.
In these proceedings, the Employer will apply Art. 24aa of the PPL Act.
Part 8: Ankle endoprosthesis.
Mobile bearing ankle joint prosthesis - 5 pieces.
A detailed description of the subject of the contract is contained in the model contract which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. The provisions of the ToR should be read together with any changes to the content of the ToR, which are e.g. the result of the replies to the Contractors' queries.
In these proceedings, the Employer will apply Art. 24aa of the PPL Act.
Part 9: Elbow and shoulder joint endoprostheses.
Task 1. Elbow prostheses - 2 pieces;
Task 2. Shoulder joint endoprosthesis - 4 pieces;
Task 3. Inverted shoulder joint prosthesis - 4 pieces.
A detailed description of the subject of the contract is contained in the model contract which is Annex 3 to the ToR and a description of the subject of the contract which is Annex 6 to the ToR. Entries of the specification should be read together with any changes to the content of the ToR, which are e.g. the result of replies to the Contractors' queries.
In these proceedings, the Awarding Entity shall apply art. 24aa of the PPL Act.