B 28, new building between Rottenburg and Tübingen, section 2, structure 5.2, bridge over the Bühlertalbach.
Structure 5.2 (overpass):
- static system: double-frame,
- superstructure cross-sectional shape: plate,
- span: 10/10 m,
- total length of the bridge: 20.00 m,
- construction height: 0,70 - 0,80 m,
- width between the railings: 11.60 m,
- Excavation excavation about 1 000 m
- concrete work about 650 m
- rebar approx. 60 t,
- steel railing approx. 50 m,
- Bridge sealing approx. 260 m
- Ground movements approx. 1 000 m