Bridge construction work | Tenderlake

Bridge construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
16 April 2019
Closing Date:
21 May 2019
Location(s):
DE141 Reutlingen (DE Germany/DEUTSCHLAND)
Description:

B 28, new building between Rottenburg and Tübingen, section 2, structure 5.2, bridge over the Bühlertalbach.



Structure 5.2 (overpass):

- static system: double-frame,

- superstructure cross-sectional shape: plate,

- span: 10/10 m,

- total length of the bridge: 20.00 m,

- construction height: 0,70 - 0,80 m,

- width between the railings: 11.60 m,

- Excavation excavation about 1 000 m 3 .

- concrete work about 650 m 3 .

- rebar approx. 60 t,

- steel railing approx. 50 m,

- Bridge sealing approx. 260 m 2 .

- Ground movements approx. 1 000 m 2 ,

Download full details as .pdf
The Buyer:
Regierungspräsidium Tübingen Ref. 47.1-Straßenbau Nord Dienstsitz Reutlingen
CPV Code(s):
45221110 - Bridge construction work
45221111 - Road bridge construction work