Demolition u. Gutting work.
- Construction:
- about 1 pc black and white plant;
- approx. 3 t dismantling and disposal KMF- u. PAH-containing components;
- Approx. 1 400 t dismantling u. Disposal masonry, concrete, expansion u. Wood elements;
- HLS:
- approx. 75 panel radiators made of sheet steel;
- about 110 St. casting radiators;
- approx. 20 St. WC, including installation frame, inlet and outlet fittings;
- approx. 55 washbasins, including installation frame, inlet and outlet fittings;
- approx. 670 m waste water pipe made of plastic or SML;
- approx. 1,000 m drinking water pipe made of plastic or multi-layer composite pipe DN 15 to DN 50 including thermal insulation;
- approx. 2 355 m heating pipe made of black steel DN 15 to DN 100 including thermal insulation;
- approx. 1 pc. Oil tank system 45 000 l, welded steel tank;
- approx. 1 oil tank system 20 500 l, welded steel tank;
- approx. 1 oil tank system 14 000 l, welded steel tank;
- Electric:
- approx. 10 pc. Electrical distributor;
- approx. 8 pieces of telecommunication distributor
- approx. 300 branch boxes;
- approx. 700 St. installation devices;
- approx. 15,000 m of cables and lines;
- approx. 1,500 m of cable ducts, protective tubes and cable carriers;
- about 250 St. lights;
- approx. 100 pieces of fire alarm components.