The new building Building D will be built between buildings C and E. The building has 5 storey levels from the site as well as an attached roof centre.
On the north-west side, the building cantilevers with operating theatre and technical floors on the 1st and 2nd floors. (Drawer)
The new structure connects to the crossbar of component C2 in all levels.
The new building D is accessed on the same level via the C-connection building. The existing C-Link elevator is being renovated and is to be expanded to two elevators.
The D-building has a necessary staircase in each case.
The façade of the new building will be continued in the design of the existing building. The cantilevered structure is equipped with a façade made of compact panels with vertical aluminium slats as sun and privacy protection
The levels of the new building D (E-1 to E 4 and technical superstructures E5) each form fire subsections / smoke compartments.
In some areas, usage units will be realized. Smoke extraction from the corridors is carried out via corridor windows or adjacent areas or a SHEV in the ceiling cavity.
Applicable services:
1 HIGHER-LEVEL SERVICES
1.1 Construction site installation
1.2 PLANNING, STATIC CALCULATION, DOCUMENTATION
2 LOCKSMITH WORK OUTSIDE
2.1 GRATING COVER LIGHT WELLS
2.2 STEIGLEITERN
2.3 RAILINGS, STAIRS, ATTIC CROSSINGS
3 LOCKSMITH WORK INSIDE
3.1 WARTUNGSBÜHNEN TECHNIKSCHÄCHTE
3.2 STAIR RAILINGS INSIDE
3.3 STRUCTURAL STEEL STAIRCASE WITH RAILING
3.4 GITTERVERSCHLAG
3.5 MISCELLANEOUS
4 STUNDENLOHNARBEITEN
4.1 STUNDENLOHNARBEITEN
Short description:
- Light well cover 6 pieces
- Checker plate cover 1 piece
- Screed parking angle 70 m
- Fixed vertical ladders 3 pieces
- Pluggable railing panels 33 pieces
- Staircase with platform 5 pieces
- Staircase attic surmounted 2 pieces
- Maintenance platforms technical shafts 22 pieces
- Stair railing 44 m
- Wall handrail 60 m