70173 Stuttgart, area Urban- / Ulrichstraße, new construction of a disposal building, engineering services according to Part 4 Section 1 HOAI
The state-owned parcels on the area on Urbanstrasse and Ulrichstrasse, Stuttgart are to be built on with a multifunctional office building (disposal building). The areas should be available to ministerial administrative uses. A possible GFA of the new building with approx. 12,700 m
New construction of a disposal building on the area Ulrich- / Urbanstraße in 70173 Stuttgart. Engineering services in accordance with Part 4, Section 1 HOAI, structural planning taking into account the assessment system of sustainable construction and planning of engineering structures. The service phases 2 to 6 as well as the engineering control and other special services identified in the respective Appendix 1 are commissioned.
The estimated building costs are approximately EUR 42,000,000 gross.
The application must be made using the application form specified by the client. The form can be downloaded from the Internet address listed in Section I.3 of the EU announcement.
Bidders and their subcontractors and subcontractors have to submit the relevant declarations of commitment according to § 5 LTMG, which can be viewed at "https://rp.baden-wuerttemberg.de/Themen/Wirtschaft/Tariftreue/Seiten/Mustererklaerungen.aspx".
This procedure is under the allocation no. 20-98493. (Please specify when making inquiries).