Construction of a new boarding school at the Lycée Pierre de Coubertin in Font Romeu.
Foundations (900 m
Painting (7,000 m
Elevator (1).
Sanitary appliances (230), cumulus (30), VMC (2), double-flow ventilation (1), CCF (70), substation (1), radiators (120), DF boxes (3), DF shutters (23 ), electrical cabinets (9), light fixtures (800), BAES (100), DAI (230), BMS (1).
Excavation (600 m
Traditional framework with zinc covering (800 m
Water resistance (800 m
Cladding (1,200 m
Aluminum joinery (245), Roller shutters (330 m
Doors (4), handrails (90 m), railings (45 m), grids (60), staircase (1).
Partitions (3,000 m
Doors (230), crutches with integrated badge reader (76).
Wood cladding (850 m