Underground drainage / pipeline-grounds.
- Baustraße, mineral, produce 200 m
- construction fence, steel frame (mobile), h = 2.00 m 100 m,
- Open drainage pipe trenches, supply plant, operate 200 m,
- over pumping, waste water, mixed water system / rainwater 110 m,
- Break up / remove / close bituminous lining. Pit 50 m
- Concrete paving, pit, record, relocate 40 m
- Pit excavation, unobstructed 400 m
- Pit excavation, installed 200 m
- load excavation, dispose / recycle, Z 0 - Z 1.2 1 000 t,
- load excavation, dispose / recycle, until Z2 / W2 100 t,
- Geotextile, sole stabilization 250 m
- Filling floor, for pipe trench, supply, install main filling 500 m
- Supply / install line zone 70 m
- Normverbau, up to 3.00 m 150 m
- Piping, stoneware DN100 - DN150 200 m,
- Pipeline, stoneware, DN200 - DN250 100 m,
- Piping, stoneware, DN300 60 m,
- rain drainage inspection shaft, LW 1 000 6 St.
- dirty water inspection shaft, LW 1 000 5 pcs,
- yard drain, concrete / cast 6 pcs,
- Road, Kl., 300/500 5 St.,
- Box gutter, concrete, 100, with cover longitudinal profile grating 125 m,
- Slot channel, stainless steel, 1.5 mm, with plasterable inspection box 6 m,
- foot gutter / grate pit concrete, with drain, up to 50/190 cm 9 pcs,
- sewer cleaning, high pressure, DN100-300 360 m,
- Leak test, air, DN 100-300 360 m,
- Leak test, manhole, DN 1000 11 St.,
- Break up / remove bitumen covering, 10-15 cm 190 m
- Milling bituminous lining, t = -4 cm 350 m
Curb, concrete bed, concrete 150 m,
- Tragsch. AC22 TN, 70/100 150 m
- Asphalt top layer Stone mastic asphalt, surface areas, carriageway 800 m
- Concrete blocks, drainable, solid stones / grass stones 175 m
- Concrete paving, concrete, rectangle 750 m
- Floor slab, retaining walls, wu, tr, including formwork / earthworks 15 m
- Prefabricated staircase, exposed concrete, pedestal, departure 2 St.,
- Water-bound path cover, incl. Completion care 250 m
- Angled retaining wall, 180/105, exposed concrete, smooth 50 m,
- Remove topsoil, leveling the terrain 600 m
- Excess land disposal / landfill fee, Z 0 - Z 1.2, W1.2 1 200 t,
- Deliver topsoil, and cover 950 m
- table tennis, concrete 1 pc,
- Seating blocks made of cast stone, rectangular, up to 50/50 cm 26 pcs,
- Bench made of cast stone, rectangular, 160/40 cm 4 pcs,
- Handrail on posts, stainless steel, outside 40 m,
- Bench in cast stone, rectangular, 160/40 cm 2 ea.,
- Double pole fence, with fence posts, h = 4.5 m, foundations 45 m,
- Double pole fence, with fence posts, h = 3.0 m, foundations 65 m,
- construction road / unbeb. Mount, dispose of 700 m
- Loosen ground, before topsoil application 1 700 m
- Cover topsoil, stored, 30-40 cm, make coarse plan 500 m
- provide topsoil, replacement missing material 100 m
- Excavation and refilling of cable trenches 230 m
- Cable protection tube flexible, type DA 110 mm Ringware PE 850 m,
- Cable duct made of plastic class D400, 800/1 165 11 St.,
- Cable duct made of plastic class D400, 800/800 2 pcs.