Locksmith work for the new construction of a partially basement children's day center with three nativity rooms, five
kindergarten rooms, multi-purpose area and kitchen, approx. 1,485 m² of usable space
Straight-running steel external staircase systems with intermediate podium and
exit podiums, 20 pcs., approx. 1.40 m wide, railings on platforms as
vertical bar elements, grates steps, MW 30x10 mm,
Hot-dip galvanised construction, 2nd pcs
stainless steel handrails on internal staircases, approx. 53 m
Fall resistant steel railing at indoor staircase system, as vertical
Steel bars made of flat steel 40x8-12 mm, including double-layer stainless steel
Round tube handrails, approx. 13.0 mm
Handrail constructions outside as delivery service for on-site installation in
exposed concrete walls, approx. 32 running m
balcony railing as vertical bar steel elements made of flat steel 35x25-12 mm,
Hot-dip galvanised construction, approx. 55 m